Text
. - -
56.?d, 9-
,/
UNITED STATES
)
/
'N \\
ATOMIC ENERGY COMMISSION
,\\
/',.,
wassincros. o.c. mos.s October 4, 1973 John G. Davis, Deputy Director for Field Operations Directorate of Regulatory Operations, Headquarters DUKE POWER COMPANY (OCON'EE 2) OUTSTANDING ITEMS LIST Enclosed for your information is an updated list of outstanding items at Oconee 2 as of October 4, 1973.
The integrity of the electromatic relief valve remains unresolved.
This item may require a restriction to the technical specifications.
The baseline inspection has been completed but at a meeting with DPC and B&W on October 1-2, 1973, the inspectors raised questions 1
If that requires additional engineering evaluations by B&W.
these questions remain unresolved the license should be limited to fuel loading and initial criticality.
6 Norman C. Moseley Director
Enclosure:
Outstanding Items cc w/ enc 1.
i RO:HQ Files i
1.DR-eentral Files 8
i Y
}
8001080 7 % 9
Duke Power Company Oconee 2 Outstanding Items List The following items remain to be completed at 10:30 a.m. on October 4, 1973.
1.
Security Plan Impicmentation incomplete on four items.
Hinge Pins on auxiliary doors remain to be secured.
a.
Automatic door closure and change of lock on a boundary b.
door remain to be completed.
g k
Two 12-inch pipe sleeves between turbine building and auxiliary c.
building must be closed.
Badging procedures for people in vital areas need to be completed.
d.
Duke Power Company is planning to complete all prior to operating license.
2.
Preoperational Testing Fifteen tests remain to be reviewed and results accepted by Duke Plan to complete this list today.
Power Company.
3.
Retromatic Release Valve Problem unresolved. Additonal data expected from DPC today. May require technical specification revision.
4.
Baseline RO:II review complete except that additional engineering evaluation by B&W required on two vessel nozzles, and some minor errors corrected The need for additional engineering evaluations should in report.
not delay issuance of license but operation should be limited to fuel loading and initial criticality until data has been received.
Anticipated date for fuel loading by DPC and Principal Inspector is Duke will probably complete all outstanding items October 6, 1973.
as indicated above and request that a license be issued on October 5,1973.