Notifies That AEC Requested Util to Justify All Surveillance Items Extended Beyond 18 Month Refueling Period
ML19317F106
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/21/1974
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001080793
Download: ML19317F106 (1)


Text

/{L{k'(f MAR 21 1974 Docket Nos.

-269 50-270 and 50-287 Note to Files:

i TECH SPEC DEFINITION OF REFUELING PERIOD (18 months) - MARCH 19, 1974 I

The Oconee Tech Specs say that the normal refueling period should not exceed 18 months without prior approval by the AEC. Duke informed me by phone that Oconee 1 first refueling will run beyond the 18 month period.

Since the 18 month period is based on surveillance requirements tied to refueling outage I requested that Duke:

1) Advise me by phone within 30 days as to what surveillance items will

-have to be extended beyond the 18 month period because they cannot be performed <iuring other outages or by other means.

2) Advise the AEC by letter by June 30 and justify all surveillance and other items which must be extended beyond the 18 month period because they cannot be accomplished without a refueling outage.

(,.

I.'A. Peltier, Project Manager Light Water Reactors Branch 2-3 Directorate of Licensing ces:

V. A. Moore A. Schwencer j