ML19317F105

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-269/68-01 Through 50-269/72-06, 50-270/68-01 Through 50-270/72-05 & 50-287/68-01 Through 50-287/72-03, & Inquiry Repts Through 50-269/72-07,50-270/72-02 & 50-287/72-02.W/o Encl
ML19317F105
Person / Time
Site: Oconee  
Issue date: 01/31/1974
From: Paulus R
US ATOMIC ENERGY COMMISSION (AEC)
To: Donaldson W
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001080792
Download: ML19317F105 (1)


Text

__

8/+,,

UNITED STATES

[ ]1. a ATOM!C ENERGY COMMISSION WASHINGTON, D.C. 20545

%f J-f

'rInY

  • JAN 1 374 William L. Donaldson Central Mail and Files DUKE POWER COMPANY, DOCKET fl0S.

50-270 AtlD 50-287 Enclosed are two copies of Regulatory Operations inspection and

~

~ inquiry reports for the subject facilities. These reports have been reviewed and privileged information exempt from disclosure pursuant to 52.790 has been deleted.

Please send one copy of the reports to the Public Document Room and one copy to the local Public Document Room.

One additional copy will be retained by R0 Files.

The reports transmitted with this memorandum are as follows:

Inspection Reports 50-269/68-1 through 50-269/72-6 50-270/68-1 through 50-270/72-5 50-287/68-1 through 50-287/72-3 Inquiry Reports Report dated 9/16/69 through 50-269/72-7, 50-270/72-2, 50-287/72-2

,:y*'>;./e

2.

c.

Robert C. Paulus

  • )_//.j',/

Senior Health Physicist Directorate of Regulatory Operations

Enclosures:

As stated cc: N. C. Moseley, R0:II, w/o encl 9

8mso 772 N

V

._