ML19317F092

From kanterella
Jump to navigation Jump to search
Forwards AO-287/74-11
Date released: 11/27/2019 Download: ML19317F092


AO-287/74-11:on 741210,failure to Monitor Reactor Quadrant Power Tilt Occurred During 40% Power Physics Testing.Caused by Operator Error.Operations Supervisors Instructed in Measurement of Quadrant Power Tilt
ML19317F093
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 12/26/1974
From:
DUKE POWER CO.
To:
References
Download: ML19317F093 (2)
Forwards AO-287/74-11
ML19317F091
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 12/26/1974
From: Thies A
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317F091 (2)