ML19317F050
| ML19317F050 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Davis Besse |
| Issue date: | 03/29/1976 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19317F037 | List: |
| References | |
| NUDOCS 8001080745 | |
| Download: ML19317F050 (1) | |
Text
,
h e'
i NUCLEAR REG LATO Y COMMISSION REGloN lli 799 ROOSEVELT ROAD GLEN ELLYN. tLLINol5 60137 March 29, 1976 K. V. Seyfrit, Chief, Reactor Technical Assistance Branch Office of Inspection and Enforcement, Headquarters f:
G. Fiorelli, Chief, Reactor Operations and Nuclear Support Branch INTERNAL VENT VALVE REQUIREMENTS It is requested that you review the attached letter from R. D. Martin to determine if the acceptance criteria being used by the licensee is acceptable for initial core loading.
In addition, it is requested that you pursue with NRR the desirability of routine opening force tests of these vent valves during subsequent refueling outages.
0 R. C. Knop, Ch f Reactor Projects Section 1
Attachment:
As stated cc w/ attachment:
B. H. Grier, IE:HQ D. Thompson, IE:HQ G. W. Roy, IE:HQ R. F. Warnick, Regional Coordinator 1
i 800i0807pf
-