ML19317F033

From kanterella
Jump to navigation Jump to search
Forwards AO-287/75-08
Date released: 11/27/2019 Download: ML19317F033


AO-287/75-08:on 750619,reactor Bldg Engineered Safeguards Pressure Transmitter Was Discovered Out of Calibr.Caused by Drift of Pressure Transmitter.Channel C of Pressure Transmitter Recalibr.Surveillance Will Continue
ML19317F083
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/03/1975
From:
DUKE POWER CO.
To:
References
Download: ML19317F083 (2)
Forwards AO-287/75-08
ML19317F031
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/03/1975
From: Parker W
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317F031 (2)