JUN 2 2 1973 Docket tios. 50-270 and 50-287
%G9 R. C. DaYoung, Assistant Director for Pressurized Water Reactors, L Ti!RU:
A. Schttencer, Chief, Pressurized Uater Reactors Br. fio. 4, L PIETING UITil DUKE P0HER COMPN!Y Oil HIGH-EliERGY LIriE RUPTURE EVAL OCO.!EE - JUNE 12, 1973 Enclosed is a sumary of tha c2ating held with Duke Pouer Corapany and Br.U cn June 12,1973. Also enclosed is an attendance list for the
~
necting.
I. A. Peltier, Project !!anager Pressurized Water Reactors Branch No. 4 Directorate of Licensing Enclosurcs:
l 1.
Sumtry of Macting 2.
Attendance List cc: RUKlecker I:Rasen RD(3)
TR Accistant Directors TR Branch Chiefs EIGculbcurne J!!cndric RP Assistant Directors RP Brcach Chiefs RClar!:, EP;1 l'ilchins/Gr.llo, CGC S: u-nien Hou
\\
_i:LCra ::ar DISTRIBUTION Dockets (3)
PWR-4 Rdg IAPeltier ASchwencer AEC PDR Local PDR yt ggy
.fM.R,,4.,,,.... k:.C/,PWR-4 omct >
.AS[ic.er IM.elt
.mf su m a >
om, 6/..,M._.../.D.6/...hh.173.
..- m.......... u, m.. u.
8001080 ] ) h f
)
m
b~
~
(
n' 4
ENCLOSURE I MEETING WITH DUKE POWER COMPANY ON HIGH-ENERGY LINE RUPTURE EVALUATION-0CONEE JUNE 12, 197_3 The purpose of the meeting was to discuss the Duke MDS Report No. 05-73.2 filed by Duke Power Company with the staff on April 25, 1973.
This report contained the " Analysis ot Effects Resulting from Postulated Piping Breaks Outside Containment for Oconee Nuclear Station, Units 1, 2 & 3."
At the meeting the staff pointed out a number of areas where the 05-73.2 report is not complete enough for the staff to complete its evaluation.
As a consequence of the meeting Duke committed to supplement the report with additional information as described below by June 22, 1973.
- 1) Provide data and discussion of electric valve operators and cables in the environment anticipated as a consequence of a high-energy line rupture in the penetration room.
- 2) _ Provide discussion of steam-line break in the oenetration rocm with regard to physical factors that would reduce penetration room over-pressure.
- 3) Provide description of existing steam-line restraint in area of safety relief valves and explore practical means to protect relief valves if needed.
- 4) Provide assessment of plant transient following a high-energy line break under the redesigned conditions - particularly with regard to the loss of all feedwater.
- 5) Provide design of new feedwater line restraint to be installed in the penetration room.
The status of plant modifications was also discussed at the meeting.
Duke reported that construction (main) was completed on Oconee 2 and that fuel loading is still scheduled for August 20, 1973.
All mechanical work is i
done on Oconee 3 and electrical work is well underway for this unit. Unit 1 was at the 40% power plateau.
[.
"'W
\\
u, I~
66 s
4-EllCLOSURE 2 ATTENDANCE LIST HIGH-ENERGY LINE RUPTURE MEE*ING DUKE POWER COMPANY June 12, 1973 I. A. Peltier AEC, Licensing, Project Manager, Oconee J. M. Hart Duke Power Company B. M. Rice i
Duke Power Company R. E. Miller Duke Power *Co.mpany R. E. Hall Duke Power Company W. H. Owen Duke Power Company K. S. Canady Duke Power Company T. L. Cotton Duke Power Company D. W. LaBelle Babcock and Wilcox Paul H. Barton Duke Power Company
. George W. Cage Duke Power Company R. W. Klecker' AEC, Licensing Shou-nien Hou
- AEC, Licensing Rudy Straub Babcock and Wilcox H. L. Brammer * -
AEC, Licensing A. Schwencer*
AEC, Licensing R. C. DeYoung*
AEC, Licensing