ML19317F023
| ML19317F023 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/27/1973 |
| From: | Peltier I US ATOMIC ENERGY COMMISSION (AEC) |
| To: | US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001080725 | |
| Download: ML19317F023 (1) | |
Text
9 DEC 2 71973 Docket Nos.
-269 50-270 and 50-287 ote to Files:
TELECON WITH A. C. THIES AND TOM COTTON, DUKE POWER COMPANY REGARDING OPERATION OF OCONEE UNIT 1 WITHOUT PRESSURIZER SPRAY - 12/18/73, 3:30 pm Duke will provide Licensing with a TWX within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> providing the following inforcation:
1.
Oconee Safety Review Committee safety analysis conclusion fr.;
operation with pressurizer electro 2atie valve, s.
always blocked b.
usually blocked but open for transients while pressurizer spray is out of service.
2.
B&W conclusion with regard to item 1.
3.
Statement regarding approved written procedures for operating without pressurizer spray inservice.
Duke will follow the above TWX with details by letter within seven days.
- 1. A. Peltier, Project Manager Light Water Reactors Branch No. 2-3 Directorate of Licensing cc: HThornburg, R0 ASchwencer VMoore
'p.6
)
soo1oso 725
/?
.