ML19317E985
| ML19317E985 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/25/1972 |
| From: | Harold Denton US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001070780 | |
| Download: ML19317E985 (1) | |
Text
MAY 2 5 $72 0
.l 6 R. DeYoung, Assistant Director for Pressurized Water Reactors, L TECHNICAL SPECIFICATIONS FOR DUKE POWER COMPANY, OCOMEX POWER STATION UNIT NO. 1 We have reviewed the technical specifications for Oconee Unit No. I transmitted by A. Giambusso May 22, 1972. We recomenand that the specifications be revised to conform to the versions which incor-porate Appendix I requirements. Ivo additional recommended changes are noted below:
Page 3.1-11 Line 16, indicate that the i determination is at operating temperature and pressure conditions.
Page 4.4-6. Line 1 does not agree with line 11 on the leakage through penetrations. Line No.1 should be revised to indicate that 507. or more of the total containment leakage will be to the penetration room.
Original signed by H. R. Denton Harold R. Denton, Assistant Director for Site Safety Directorate of Licensing
Enclosures:
1.
Memo to JMHendrie from AGiambusso dtd 5/22/72 w/encls.
2.
Duke Power Co., Oconee Nuclear Station Unit No.1, Doc. No. 50-269 cc w/o encls:
J. M. Hendrie, L F. Schroeder, L DISTRIBt7 TION:
L-Suppl L-Rdg AD /SS-Rdg SAB -Rdg omer >
SABIL,......,,,
....AD /,S S ;.L
- 7. _* />
(C-suamt >
...WP.G
.11iea2,......t.9,!
marr > -. 5/2,5D2
).5/.../72_
Forum AEC.Ste (Rev.9 53) AECM 0240 us--ie-n eas-e us-os 8 001070 gg
.-.