ML19317E912

From kanterella
Jump to navigation Jump to search
Discusses 730430 Telcon W/Util Re 730501 Receipt of BAW-10039,BAW-10054,BAW-1387 & BAW-10064.Interim Fuel Densification Rept Due 730501 & Final Fuel Densification Rept Due 730709.Draft Tech Spec Changes Due 730508
ML19317E912
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 05/01/1973
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001070713
Download: ML19317E912 (1)


Text

[O ~, )[e f 1 IN3 gg NOTE FOR FILES TELECON WITH DUKE AND B&W ON TOPICAL AND OTHER REPORTS REQUIR COMPLETION OF OUR REVIEW

- APRIL 30, 1973 R. Steinke, R. Straub (B&W) and K. Canady, T. Cotton (Duke) reported that BAW-10039, BAW-10054, BAW-1387 and BAW-10064 have been mailed

.(we received 5/1/73).

j They also reported that forty (40) copies of the Oconee 2 interim I

The final report on fuel densification would be delivered 5/1/73.

fuel densification report will be delivered 7/9/73.

Oconee Unit 1 tech spec changes for 100% power operation will be delivered by May 8, 1973 in draft form.

hk.

I. A. Peltier, Project Manager Pressurized Water Reactors Branch No. 4 Directorate of Licensing cc:

R. C. DeYoung V. Stello J. Knight D. Ross A. Schwencer H.-Schierling S. Hou I. Peltier (2) i

,!, x p

4 soosen 7, g

. y ~..--

.r _ -

~

(

4 n

. q:

d x

~

ATTAC1gfEfr Mens of Famility n

jh 1ame Staties Unit 1 APPlisant

Duk.a Power Company

[

Doeket h

50-269' Das Data for 'humanen : Comments en the draft enviremmental statement med the appliemme's environmental report must L

be received by Jammary 17, 1972. In view of the haliday period, we have allowed additismal f

tima for reopense and transmittal.

l l

I l

i r

k

(

OFFICE >

l SUNHAME>

DATE >

L,,

Foran AIC-Ste (Rev. 9-53) ASCM 0244 o u s aovenwuant muvus. orver. t ot t a t e _4e s e

a

.~~e

_..__-. m

_.- _ m _ _ __

l

. ~ ~ _..

[

i-------

-