ML19317E897

From kanterella
Jump to navigation Jump to search
Responds to 730427 Memo Re Tech Specs Reporting Requirements.Describes Actions to Be Taken by Utils
ML19317E897
Person / Time
Site: Oconee, Arkansas Nuclear  Duke Energy icon.png
Issue date: 05/04/1973
From: Ferguson R
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001070697
Download: ML19317E897 (1)


Text

.

M Docket Nos. 50-26 50-270 MM 4y and 50-313 R. C. DeYoung, Assistant Director for Pressurized Water Reactors. Licensing REPORTING REQUIREMENTS - TECHNICAL SPECIFICATIONS

/

In response to your meno dated April 27, 1973 regarding the above subject, the appropriate sections of Technical Specifications for Arkansas 1 and Oconee 1/2 have been reviewed by the Project Managers. The actions they

(

will taka to conform the Technical Specifications of the above plants I

are as follows:

I Oconee 1/2 - The Oconee 1 Technical Specifications conform very closely with the reporting requirements listed in the D. Skovholt memo dated 2/21/73.

Slight changes are necessary to obtain complete conformance. T1ese changes will be made in the Units 1 and 2 Technical Specifications when Unit 2 is licensed Qune 30, 1973). This will minimize the number of actions required on Unit 1 Technical Specifications.

The Arkansas 1 Technical Specifications have a slightly earlier Arkansas 1 version of this section on reporting requirements. It includes a "First Tear Operation Report" (which we intend to retain) and differs in othes sections only slightly. We intend to make the few changes necessary to conform by June 6,1973.

Original Signed by Robert L Ferguson R. L. Ferguson, Acting Branch Chief Pressurized Water Reactors No. 4 Directorate of Licensing ec:

A. Schwencer R.

rnero I. Peltier DISTRIBUTION Dockets (3)

RP Reading PWR-4 Reading L M 4 Q __ _

)) ggA omen >

If RFerguson:emp j

sumut >

em..m]

=n, s/4/73

.43-se-sisas-a oss-ers F.enn AEC-Ste (Rev.9-33) AECM 9240 8001070 $ [ 7 [

-