Forwards Summary of 730131 Meeting W/Util & B&W Re Fuel Densification.Attendance List End
ML19317E882
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/08/1973
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001070683
Download: ML19317E882 (5)


Text

_ _. -

FEB 8 1973 Docket No. 50-269 R. C. DeYoung, Assistant Director for Presnurized Water Reactors, L TmtU:

A. Schwencer, Chief Pressurized Water Reactors Branch No. 4, L MEETING WITH DUKE POIGR COMPANY AND BABCOCK & WILCOI ON PUEL DENSIFICATION POR OCONEE 1 - JANUARY 31, 1973 Enclosed is a se== mary of the meeting held on January 31, 1973 with Duka Power Company and Babcock & Wilcox to discuss Pual Densification for Oconee 1.

Also enclosed is an attendance list for the meeting.

E. A. Peltier, Project Manager Pr.esurized Water Reactors Branch No. 4 Dire torate of Licensing Enclosures DISTRIBUTION 1.

Meeting Summary Docket File - 1 2.

Attendsace List PWR-4 Reading RP Reading cc: RSBoyd IAPeltier DShovholt ASchwencer DKnuth Etoy - 2 D hecary ETedesco HDenton FWR Brac-h Chiefs RWtlecker MRosen 30 (3)

VStello DPRoss Oe.chierling AEC participante AEC PDR Local PDE 9

R1U HAC PAMPTDMFn THAT THFCh MATFC rnMTATM MA PDAPDTFTARY TNFORMATTON PWR-4 L:C/P)d-4

/[agd,,,

omer, l

someaur > IAEelt

.kaf- - Akh cencer om>.2/. //

/13......2/

/73 1

Posun ABC-SIS (Rev.9-53) ABCM 0340

'T.

  • u a oovun aste emwine orpet 1972-466-983

,- ['

[! [% '.A,h

' ' ' *\\ -

UNITED STATES ATOMIC E!JERGY COMMISSION

'\\'/L?.

f' wAsmnaron. o.c. 2o54s

.;*N j.. '

i fi C N Docket No..50-269 R. C. DeYoung, Assistant Director for Pressurized Water Reactors, L TilRU:

A. Schwencer, Chief, Pressurized Water Reactors Branch No.~4, L MEETING UlTH DUKE POWER COMPANY AND BABCOCK & WILCOX ON FUEL DENSIFICATION FOR OCONEE 1 - JANUARY 31, 1973 Enclosed is a su:.:::ary of the meeting held on January 31, 1973 with Duke Power Company and Babcock & Wilco): to discuss Fuel Densification for Oconce 1.

/.lso enclosed is an attendence list for the meeting.

Jl

\\Ew q

I. A. Peltier, Project Managar Pressurized Unter Reactors Branch No. 4 Directorate of Licenstig

Enclosures:

1.

Meeting Summary-2.

Attendcnce List cc: RSBoyd.

DSkovholt DKnuth RMaccary RTedesco HDenton PWR Branch Chiefs

  • RUKlecker MRosen' R0 (3)

VStello DFRoss HSchierling.

AFC participants

  1. 2C PDR Local PDR B&W HAS CONFIRMED THAT THESE NOTES CONTAIN NO PROPRIETARY INFORMATION

e 1

1 ENCLOSURE I MEETING WITjl DUKE POUER CO'GANY AND

_BABCOCX & WILCOX ON FUEL DENSIFICATION

_FOR OCONEE 1 - JANUARY 31, 1973

_ Summa rv, The purpose of the_ meeting was to provide the Staff the opportu it to outline for Duke and B&W the nature of the fuel densifi n y investigation, what would be required from the applicant and cation to clarify ~ schedules.

Beach fuel densification Safety Evaluation and B

(

y.

o nt obtain the SER as soon as it became public.

e to Hans Schier11ng. (DOL) was named as the fuel densification would be participating in the review in selected areas proj ect introduced.

i It was pointed out that the staff's indepth evalsation of th l

. generic B&W fuel denhification investigation will be conducted i

e using BAW-10054 and BAW-1387 (which addresses Oconce 1 only) that our evaluation of all other BLW plants includi i

and will depend on our findings on this "leadplant" technical eval ng Oconce 2 (selection of Oconee 1 as lead plant is based solely uation.

.of BAW-1387).

on availability It was made-clear that the B&W fuel densification analy i apply only to the first fuel cycle unless subsequent cycles s s would identical-in fuel loading.

new fuel loadings'could be required and technical specificatioIf are would' include the appropriate restrictions.

ns BAW-1387.which resulted in a reduction of 2% in o n

5% limit on quadrant tilt and the related technical specific ti ver and a changes.

a on B&W stated that :1ts intent is that the model densification analysis will be used for all B&W plants used for fuel

' Staff' named the codes being used in its independent analysis The (BUCKLE, CAPON and COBRA III-c).

p

!-01 t,

y<

,w r-I 7.

p,

- I The Staff gave B&W preliminary information regarding areas where more-information is needed from B&W and the following steps were outlined..

-1..The Staff vill prepare a list of questions to be submitted to t.he~ applicant in writing by February 24, 1973.

(Informal

~

exchange would take place in the meantime).

2. 'A meeting would be held within 10 days after B&W receives the questions to discuss questions and answers.

3.

The. applicant will submit written answers as soon as possible after the meeting.

~

4.' The Staff will issue its Safety Evaluation w:sich will serve as the basis for technical specification changes as soon as possibic (May 1, 1973 would.be timely for projected full pouer operation of Oconce 1).

i

~

u 1

e l'

i l

I t

l.

l I.

I t

t.. !.

c.

v k; 1l u

I.

4;s

. =

_-c,;

+

I.

4 1.

ENCLOSURE II MEETING WITH DUKE POWER COMPANY AND BABC0CK & UILCOX ON FUEL DENSIFICATION FOR OCONEE 1 - JANUARY 31, 1973 ATTENDANCE SHEET i

Atomic Energy Commission Duke Power Comonny I

J. Korthener U. Potapovs-i I. A. Peltier K. S. Canady S. D. MacKay.

D. F. Ross l

H. Schierling g

D. K. Davia i

. G. N. Lauben

.A.'Schwencer B. C. Buckicy Babcock & Wilcox

'R. Edwards l

R. Turner l

W. T. Brunson-l

41. F. Sankovich l

J. F. Scott S. Hellman l

.R. V..DeMars-L. L. Losh G. R. Horn J.'T. Willse i

J. R. Penland-R. R. Steinke R. Straub J. S. Tulencol R. J. Walker fd4yl%f I

s