FEB 8 1973 Docket No. 50-269 R. C. DeYoung, Assistant Director for Presnurized Water Reactors, L TmtU:
A. Schwencer, Chief Pressurized Water Reactors Branch No. 4, L MEETING WITH DUKE POIGR COMPANY AND BABCOCK & WILCOI ON PUEL DENSIFICATION POR OCONEE 1 - JANUARY 31, 1973 Enclosed is a se== mary of the meeting held on January 31, 1973 with Duka Power Company and Babcock & Wilcox to discuss Pual Densification for Oconee 1.
Also enclosed is an attendance list for the meeting.
E. A. Peltier, Project Manager Pr.esurized Water Reactors Branch No. 4 Dire torate of Licensing Enclosures DISTRIBUTION 1.
Meeting Summary Docket File - 1 2.
Attendsace List PWR-4 Reading RP Reading cc: RSBoyd IAPeltier DShovholt ASchwencer DKnuth Etoy - 2 D hecary ETedesco HDenton FWR Brac-h Chiefs RWtlecker MRosen 30 (3)
VStello DPRoss Oe.chierling AEC participante AEC PDR Local PDE 9
R1U HAC PAMPTDMFn THAT THFCh MATFC rnMTATM MA PDAPDTFTARY TNFORMATTON PWR-4 L:C/P)d-4
/[agd,,,
- omer, l
someaur > IAEelt
.kaf- - Akh cencer om>.2/. //
/13......2/
/73 1
Posun ABC-SIS (Rev.9-53) ABCM 0340
'T.
- u a oovun aste emwine orpet 1972-466-983
,- ['
[! [% '.A,h
' ' ' *\\ -
UNITED STATES ATOMIC E!JERGY COMMISSION
'\\'/L?.
f' wAsmnaron. o.c. 2o54s
.;*N j.. '
i fi C N Docket No..50-269 R. C. DeYoung, Assistant Director for Pressurized Water Reactors, L TilRU:
A. Schwencer, Chief, Pressurized Water Reactors Branch No.~4, L MEETING UlTH DUKE POWER COMPANY AND BABCOCK & WILCOX ON FUEL DENSIFICATION FOR OCONEE 1 - JANUARY 31, 1973 Enclosed is a su:.:::ary of the meeting held on January 31, 1973 with Duke Power Company and Babcock & Wilco): to discuss Fuel Densification for Oconce 1.
/.lso enclosed is an attendence list for the meeting.
Jl
\\Ew q
I. A. Peltier, Project Managar Pressurized Unter Reactors Branch No. 4 Directorate of Licenstig
Enclosures:
1.
Meeting Summary-2.
Attendcnce List cc: RSBoyd.
DSkovholt DKnuth RMaccary RTedesco HDenton PWR Branch Chiefs
- RUKlecker MRosen' R0 (3)
VStello DFRoss HSchierling.
AFC participants
e 1
1 ENCLOSURE I MEETING WITjl DUKE POUER CO'GANY AND
_BABCOCX & WILCOX ON FUEL DENSIFICATION
_FOR OCONEE 1 - JANUARY 31, 1973
_ Summa rv, The purpose of the_ meeting was to provide the Staff the opportu it to outline for Duke and B&W the nature of the fuel densifi n y investigation, what would be required from the applicant and cation to clarify ~ schedules.
Beach fuel densification Safety Evaluation and B
(
y.
o nt obtain the SER as soon as it became public.
e to Hans Schier11ng. (DOL) was named as the fuel densification would be participating in the review in selected areas proj ect introduced.
i It was pointed out that the staff's indepth evalsation of th l
. generic B&W fuel denhification investigation will be conducted i
e using BAW-10054 and BAW-1387 (which addresses Oconce 1 only) that our evaluation of all other BLW plants includi i
and will depend on our findings on this "leadplant" technical eval ng Oconce 2 (selection of Oconee 1 as lead plant is based solely uation.
.of BAW-1387).
on availability It was made-clear that the B&W fuel densification analy i apply only to the first fuel cycle unless subsequent cycles s s would identical-in fuel loading.
new fuel loadings'could be required and technical specificatioIf are would' include the appropriate restrictions.
ns BAW-1387.which resulted in a reduction of 2% in o n
5% limit on quadrant tilt and the related technical specific ti ver and a changes.
a on B&W stated that :1ts intent is that the model densification analysis will be used for all B&W plants used for fuel
' Staff' named the codes being used in its independent analysis The (BUCKLE, CAPON and COBRA III-c).
p
!-01 t,
y<
,w r-I 7.
p,
- I The Staff gave B&W preliminary information regarding areas where more-information is needed from B&W and the following steps were outlined..
-1..The Staff vill prepare a list of questions to be submitted to t.he~ applicant in writing by February 24, 1973.
(Informal
~
exchange would take place in the meantime).
- 2. 'A meeting would be held within 10 days after B&W receives the questions to discuss questions and answers.
3.
The. applicant will submit written answers as soon as possible after the meeting.
~
4.' The Staff will issue its Safety Evaluation w:sich will serve as the basis for technical specification changes as soon as possibic (May 1, 1973 would.be timely for projected full pouer operation of Oconce 1).
i
~
u 1
e l'
i l
I t
l.
l I.
I t
t.. !.
c.
v k; 1l u
I.
4;s
. =
_-c,;
+
I.
4 1.
ENCLOSURE II MEETING WITH DUKE POWER COMPANY AND BABC0CK & UILCOX ON FUEL DENSIFICATION FOR OCONEE 1 - JANUARY 31, 1973 ATTENDANCE SHEET i
Atomic Energy Commission Duke Power Comonny I
J. Korthener U. Potapovs-i I. A. Peltier K. S. Canady S. D. MacKay.
D. F. Ross l
H. Schierling g
D. K. Davia i
. G. N. Lauben
.A.'Schwencer B. C. Buckicy Babcock & Wilcox
'R. Edwards l
R. Turner l
W. T. Brunson-l
- 41. F. Sankovich l
J. F. Scott S. Hellman l
.R. V..DeMars-L. L. Losh G. R. Horn J.'T. Willse i
J. R. Penland-R. R. Steinke R. Straub J. S. Tulencol R. J. Walker fd4yl%f I