O JAN 3 0 W3 Docket Nos. 5 9/270/287 R. C. DeYoung, Assistant Director for Pressurized Water Reactors, L A. Schwencer, Chief, Pressurized Water Reactors Branch No. 4. L i
T10tD r MEETING WITil DUKE POWER COMPANY AND BABCOCK & WILCOX - OCO Enclosed is a sumnary of the meeting held on January 26, 1973 with Duke Power Company and Babcock & Wilcox to discuss the LOCA An attendance list is also enclosed.
analysis for the floodline break.
c I. A. Peltier, Project Manager Pressurized Water Reactors Branch No. 4 Directorate of LicensinF
Enclosure:
1.
Meeting Summary 2.
Attendance List cc: RSBoyd DIb7RIBUTION DSkovholt Docket Files DKnuth RP Reading RMaccary PWR-4 Reading
's RTedesco IAPeltic" EICoulbourne (2)
EDenton
-(
VStello Applicant
\\
PWR Branch Chiefs
(
L'Klecker NRosen
)'.
Local PDR
\\
N
\\
h 1
I' 9
omcs s,
- PWR 4-
....- PWRr4 -
i IAPelti kmf ASc cer
[
our>.1/..N_/73
.1/jp/73 e u s covswea t most a oreca: 1972-466 983 Foran AEC-51s (Rev.9 53) AEcM 0240 8001070 h 2
~
wr44*,
UNITED STATES
.I \\
ATOMIC ENERGY COMMISSION
'I ',t WASHINGTON, D.C. 20545 JAN 3 0 1973 Docket Nos. 50-269/270/287~
R. C. DeYoung, Assistant Director for Pressurized Water Reactors, L THRU:
A. Schwencer, Chief, Pressurized Water Reactors Branch No. 4, L MEETING UITH DUKE POWER COMPANY AND BABCOCK & WILCOX - OCONEE ECCS Enclosed is a summary of the meeting held on January 26, 1973 with Duke Power Company and Babcock & Wilcox to discuss the LOCA analysis for the floodline break. An attendance list is also enclosed.
I. A. Peltier, Project Manager Pressurized Water Reactors Branch No. 4 Directorate of Licensing
Enclosure:
1.
Meeting Succary 2.
Attendance List ec:
RSBoyd DSkovholt DKnuth RMaccary RTedesco HDenton VStello PWR Branch Chiefs RWKlecker MRosen R0 (3)
ENCLOSURE I MEETING WITH DUKE POWER COMPANY AND BABCOCK & WILCOX - OCONEE ECCS Summary The purpose of the meeting was to hold a technical discussion of the B&W analysis and the staff'o independent analysis of the LOCA resulting from a flood line break.
Basically there are two areas of concern.
The first area is the heat transfer used in the B&W model during the short term (first 1000 seconds). The second area is the long term flooding of the core after the transient has been turned around.
In the first area the staff feels that B&W should index its model with the only available heat transfer data in this regime (GE FLECHT data) or do additional FLECHT type experiments.
B&W feels that varying heat transfer in its model has bracketed the GE data.
In the second area the staff feels that it nay take hours if not days to completely flood and quench the core after the transient has been terminated and so the concept of abundant cooling water is strained.
B&W and Duke committed to taki an n l action to valve in low pressure injection water in abs
. einutes after the start of the accident in order to more rapidly cover the core. Duke and B&W were told that this scheme would be reviewed from the operational point of view.
l 4
- ' e ENCLOSURE II DUKE - B&W - AEC MEETING - JANUARY 26, 1973 ATTENDANCE LIST Atomic Energy Commission I. A. Peltier D. K. Davis Paul Norian Roger Mattson Denny_Ross
~
)