Forwards 720615 Meeting Summary W/Util & B&W Re Shift Crew Size
ML19317E867
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/19/1972
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001070665
Download: ML19317E867 (4)


Text

%

s c'

o

,1

'JCI.' 013T4 Docket Nos. 50-269 50-270 and 50-287 R. C. DeYoung, Assistant Director for Pressurised Water Reactors, Licensing THRU:

A. Schwencer, Chief, Pressurised Water Reactors Branch No.C&4Ld S!g:edb-[

l E W.Schwe:.csr MEETING WITE DUKE FOWIR CONFANY AMD BABCOCK AND WILCOX CONCERNING SHIFT CREW SIZE FOR OCONER STATION OPERATION - JUNE 15, 1972 Enclosed is a summary of the meeting held on June 1), 1972 with Duka Power Company tad Babcock sad Wilaox. An attendance list is also enclosed.

Drisinu Sinned by, i

Irving.L Pelties ;

I. A. Paltier, Project Leader Pressurized Water Raaetors Branch No. 4 Directorata of Licensing Enclosuras:

1.

Meeting Sununary 2.

Attendance List DISTRIBUTION Docket (3) cc w/ nela:

RP Reading R. S. Boyd PWR-4 Reading D. Skovholt D. Knuth R. Maccary R. Tedesco H. Denton 7WR 3 ranch Chiefs R. W. Klackar M. Rosen 10 (3)

I. A. Pcitier Licensing Assistant (2)

R. Van Niel L:PWR-4

_,L, : P,

.t /

,e omer,

IAPeltgs%.tmp_

ASchwencer sunnawc >

oarc,

6 /,, /,,ff,/,7,2,,,,,,},,6/,,,],,Q/,22,,,,,,,,,,,,,,,,,,,,,,,,,,,

Forse AIColts (Rev. 9-33) AECM 0240 eee

.es-le-nees-us-e s smon 665 A w

4

f

)

0 f

L/

ENCLOSURE I_

7 4.

OCONEE SHIF1 CREW SIZE MEETING June 15, 1972 Summary Duke made a presentation on how the Oconee Station was designed to permit two dition operators to completely shut Units 1 and 2 down to a safe hot shutdown con Duke postulates that the loss of the from outside of the control room. ding emergency situation as far as operating control room is the most demanAccording to Duke, two licensed operators can bring personnel are concerned.the reactor to hot shutdown from outside the control roo having first taken any action in the' control room in seven (7) minutes.

On the basis of the above Duke proposes the following mannin8 for one; one and two-and one, two and three unit operation.

Unit-1 Unis 1 & 2 UniEs 1, 2 & 3 1 (1) 1 (1)

J (1)

Shift Supervisors (SRO) 1 (1)

Assistant Shift Supervisor (SRO)

Control Operator (RO) 1 (1) 1 (1) 2 (2)

Assistant Control Operator (RO) 1 (1) 2 (2) 2 (2) 1 (2) 1 (3) 2 (3)

Utility Operator Total 4 (5) 5 (7) 8 (9)

SRO - Senior Reactor Operator RO - Reactor Operator The nEnbers in the table represent the minimum crew size and the ones in ( )

Since Unit 2 is following so close the crew size during startup.

behind Unit 1 the " four- (4) men" in the Unit 1 column is no longer applicable.

represent Duke stated that on the basis of its experience with CV Duke could not and disgruntled employees which are detrimental to safety.

define the safety hazard in specifics, however.

down actions Duke also said it would train people to take the critical shut and run a test from 15% power to show that the plan is feasible.

We told Duke that we would give the matter further staff evaluation and inform In the meantime our position remained Duke by letter of our final position.

as stated ~on the next page.

L

a-s 2-OCONEE NUCLEAR STATION MINIMUM OPERATING Sli17T REQUIhW Licensed Units Shift Position 1

2 3

Shift Supervisor -(SRO) 1 2

3 Control operator (RO) 1 2

3 Asst. Control'0perator (RO) 1 1

1 Utility Operator 2

3 5

Health Physics Technician 1

Instrument Technician 0

0 1

r Minimum Shif t Crew 5

8 14 Not required if the shift crew meets the qualifications of the Health Physics Tecnnician SRO - Senior Reactor Operator 30 - Reactor Operator 0

e O

e

s

_ w, ___ _

g ENCLOSURE II; OCONEE NUCLEAR STATION MEETING

.1-ATTENDANCE LIST June 15, 1972 FUNCTIONAL TITLE _

ORGANIZATION _

NAME_

Project Leader, PWR-4 AEC, Licensing Chief, PWR-4 I. Peltier AEC, Licensing Superintendent A. Schwencer Duke - Oconee Project Manager

. J.'Ed.' Smith Babcock & Wilcox Manager, Technical and Nuc3 R. V. Straub Duke Power Company Service Paul H. Barton.

System Nuclear Engineer

. Duke Power Company K. S. Canady Duke Power Company Assistant Operating Engine?

R. J. Ansell Duke (ONS)

Operating Engineer

' George-W. Cage Duke (ONS)

Staff Electrical Engineer Maurice McIntosh Duke Power Company Senior Vice President B.' M. Rice.

. Duke Power Company Assistant Manager Steam A. C. Thies Duke Power Company Production W. 0. Parker Principal Reactor Inspect @

AEC, R0:II Reactor Safety Specialist C.:E. Murphy AEC, Licensing C. R. Van Niel-h i