Monthly Operating Rept for May 1975
ML19317E505
Person / Time
Site: Oconee 
Issue date: 06/10/1975
From: Tuckman M
DUKE POWER CO.
To:
Shared Package
ML19317E500 List:
References
NUDOCS 7912180742
Download: ML19317E505 (3)


Text

~iguiatorj Cc ket,5.4

" 1 5 "/; #

DOCKET NO. 50-269 PREPARED BY M. S. Tuckman

'd OPERATING STATUS 1.

REPORTING PERIOD:

May 1. 1975 THROUGil May 31. 1975 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED PCUER LEVEL OEit):2568 NET CAPABILITY OMe-Net) :

871 3.

POWER LEVEL TO WilICll RESTRICTED (IF A'iY):(MWe-Net) none 4.

REASONS FOR RESTRICTION (IF ANY) 8 " " '

Y* #

5.

NUMBER OF HOURS Tile REACTOR WAS CRITICAL 731.1 2028.8 11829.4 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENEIMTOR ON-LINE 713.6 1843.2 1097.6 8.

UNIT RESERVE SilUTDOUN HOURS 9.

GROSS THERMAL ENERGY GENERATED (!Eal)1751058 4064223 22301733 10.

GROSS ELECTRICAL ENERGY GENERATED 625190 1434920 7753620 (t.gi;)

11.

NET ELECTRICAL ENERGY G"..NEIMTED 596417 1344201 7297220 (tgit) 12.

REACTOR SERVICE FACTOR 98.3 56.0 72.0 13.

REACTOR AVAIL \\3ILITY FACTOR 98.3 14.

UNIT SERVICE FACTOR 95.9 50.9 61.4 15.

UNIT AVILABILITY FACTOR 95.9 16.

UNIT CAPACITY FACTOR (Using Net 92.0 42.6 51.0 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 90.4 41.8 50.0 18.

UNIT FORCED OUTAGE RATE 48.6 22.1 19.

SHUTDOWNS SCHEDULED OVER NE :"' 6 M0!T"HS (TYPE, DATE A DURATION OF FACH:)

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = F0"2S REACTak "AS CRITTCAT. X 100 110URS 1:1 RCPCR11NG PERIOD REACTOR AVAIL 9ILITY FACTOR = 110URS RFACTOR !?AS jyAIL\\3LC TO OPERATF. X 100 Il0URS 1:1 REPCnu.G PFRICO UNIT SCRVICE TACTOR

= II0t*CS CE;'rRAT07 ON L7"E X 100

!!0URS IN RE.'ORI' NG PERICD UNIT AVAILWLITY FACTOR = IIOURS "NTT MS A"AIIanLE TO CENFRATE X 100 IIOURS IN REPURTI:;G P1:RIOD UNIT CAPACITY FACICR

= NTT ELECTRICAL PC'4ER CENERATED V 100

[ Net C.1p.ibili;y or Design ("wc-Et),1 X HOURS IN RCPut!D:C 7h 2 l R O 7Wyg UNIT FORCED OUTAGE RATC =

0.

' CUTAGE UOURS

!!OURS GENE!:ATOR ON 1.INC + FORCED CUTAGC iluuRS

D CKET NO.

50-269 --

UNIT SHUTDOWNS UNIT NAMii Oc nee Unit 1 DATli May 10, 1975 REPORT MONTil May, 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN

('

NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 8

750517 S

30.4 11 1

Control Rod Repatch (1) REASON (2) METilOD A-EQUIPMENT F AILURE (EXPLAIN) l -M ANIfAL B-MAINT. OR TEST.

2-M ANUAL C-RLI ULLING SCRAM

('

E-OPFRATOR TRAINING AND SCRAM D-REGULATORY RESTRICTION 3-AUlOM ATIC LICENSE EXAMINATION l'- A DMINIS1 R A11VE G-OPLRAllONAL ERROR (EXPLAIN) 11 -U1111 R (1.XPl.AIN)

SUMMARY

Unit remained base loaded with the exception of a short scheduled outage for control rod repatch.

DOCKET NO. 50-269 UNIT oconee #1 DATE 6/9/75 AVERAGE DAILY UNIT POWER LEVEL MONTH May, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe net) 1 848 17 599 846 18 2

3 842 19 587 773 4

848 20 820 5

852 21 858 850 22 6

855 849 23 7

845 8

849 24 843 9

848 25 840 848 26 10 857 849 27 11 857 12 849 23 861 842 29 13 845 30 869 14 863 15 845 31 16 852 DAILY UNrr POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.