Monthly Operating Rept for Aug 1976
ML19317E453
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/09/1976
From: Bare L
DUKE POWER CO.
To:
Shared Package
ML19317E449 List:
References
NUDOCS 7912180708
Download: ML19317E453 (3)


Text

N

-UNI'A Oconso Unit 3 DATE 9/9/76 DOCKET NO.

50-287 Q

PREPARED BY L. J. Bare OPERATING STATUS 1.

REPORTING PERIOD:

August 1 THROUGH August 31, 1976 GROSS HOURS IN REPORTING PERIOD:

744.00 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (HWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.

REASONS FOR RESTRICTION (IF ANY) f This Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 4559.7 11704.0 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 744.0 4503.3 11452.0 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH) 1860376 10849608 26767658 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 638280 3738430 9183344 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 610094 3566632 8745066 12.

REACTOR SERVICE FACTOR 100.0 77.9 78.0 13.

REACTOR AVAILABILITY FACTOR 100.0 77.1 79.6 14.

UNIT SERVICE FACTOR 100.0 76.9 76.4 15.

UNIT AVAILABILITY FACTOR 100.0 76.9 76.4 16.

UNIT CAPACITY FACTOR (Using Net 94.2 69.9 66.9 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 92.5 68.7 65.7*

18.

UNIT FORCED OUTAGE RATE O

20.6 15.2 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

September 18 - Refueling - 46 days 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100

!!OURS IN REPORTING PERIOD REACTOR AVAIL \\BILIW FACTOR = HOIIPS REACTOR k'AS AVAIL \\Gl.E TO OPERATE X 100 110URS IN REl'ORTING PERIOD UNIT SERVICE TACTOR

= hcl *PS CD;ERATOR ON I.T NE X 00 HOURS IN REPORTING PERIOD UNIT AVAIL \\BILITY FACTOR = 1100RS tfNIT WAS AVAT1 ALLE TO CENERATE X 100 HOURS IN REPORTING t'ER10D UNIT CAPACITY FACTCR

= NET ELECTRICAL PCbER CT.NT.RATFD

_y (N.it C.ipatrility or Desig gt - c t ).1 X 1B S 15 FPt hnL.

PERIOD

}$Q UNIT FORCD OUTACE RATE - FORCED OUTAGE HOURS X 100 HOLHS GENERATOR ON !.INE + FORCED CUTAGE HOURS

50-287 DOCKET NO.

UNIT Oc nee Unit _3 DATE 9/9/76 AVERAGE DAILY UNIT POWER LEVEL MONTH August, 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 726 632 17 1

547 748 18 2

773 837 19 3

840 840 20 4

849 5

851 21 853 6

857 22 853 7

857 23 853 746 24 8

852 857 25 9

'857 26 852 10 851 853 27 11 849 850 28 12 843 13 848 29 14 844 30 851 854 15 849 31 847 16 DAILY UNrr POWER LEVEL FORM INSTRUCrlONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be.>ceasions when the daily average power level exceeds the 1007o line (or the restricted power lesel line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

[i.

f 50-287 D CKET NO.

Oconee Unit 3 UNIT SHUTDOWNS UNIT N AMti 9/9/76 DATli REPORT MONTil August, 1976 4

TYPE fAETHOD OF F FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

. REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS

}

(1) REASON (2) METilOD A -EQUIPMENT F AILURE (EXPLAIN) 1-MANUAL B - MAINT. OR TEST.

2-MANUAL C-RLI'ULLING SCR AM D-REGULATORY RFSTRICTION 3-AUTOM ATIC E-OPERATOR TRAINING AND SCRAM i

LICENSE EXAMINATION F-ADMINIST R AllVE G-OPLRAllON AL ERROR ILXPLAIN) 11 - OlllL R (E hPLAIN)

SL MMARY:

No outages this month.

.