ML19317E441
| ML19317E441 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/09/1977 |
| From: | Parker W DUKE POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19317E442 | List: |
| References | |
| NUDOCS 7912170617 | |
| Download: ML19317E441 (2) | |
Text
. - _ _
U.S. NUCLE AR REGULAToPY CoMMIS~
N co
.u NRC appe 195 2
f@
(2 76) j [ChdWh l
NRC DISTRIBUTION ron PART 50 DOCKET MATERI AL I
E FROM:
DATE oF DOCUMENT
' ' T O ~.
Duke Power Company 12/09/77 N. R. C.
Charlotte, North Carolina i
o,7g,,eg,y g g William O. Parker, Jr.
12/15/77 i
ht-En O NoToRizE o amor iNeUTromu NuusEm or coe:Es RECEtVEO l
doRIGIN AL MNOLASSIFIED
, g e geg acce-EN CLoSU RE DESCRIPTION LTR TPANS 'UE KLI.DW"ING:
ML'IHLY EPOKI' RR November 1977 FI.ANI & C}SaENT OPERABILITY & AVAII.ABILIIT.
MS te.eux.L 'IO E USE IN PEEPARING ' GRAY 300K EY FI.ANS &'OM.SCNS.
i.
i l
FI).NI UAME: Oconee Units.1-2-3 RJL 12/15/77 (1-P)
(9-P) 7 EMC FOR ACTION /INFORMATION I
I MIPC W/2 CYS FOR ACIION i
}
I l l l
l l !
I i i i
p-y INTERNAL DISTRIBUTION j
C EG r i ! El l
l l
~
l l l 1 l
.*. ms s
i i EFANCH C"4 + (ID 0"R. ) S e n ts M /4L I
I i
i u._..
l l
I I
L I
i i
i i
l I
I i
i i
I l
I i
i i
l i
i i
l i
I 8
I I
I i
I i
i I
l i
I i
i I
l 1
l I
i i
I t i i
EXTERN AL DISTRIBUTION CONJROL NUMEER i
A" WAL AAM-A,tP
- l}
I TIC:
I m
NSIC 1
1 (U12170h 77 00028 I
t I
r i
l i
DUKE POWER COMPANY Powen Buttorwo 422 Socra Cucacu Srnrrr, C1unt.orir. N. C. asa4a wiwau o. maaxcm.sm.
December 9, 1977 Mt PREStDENT TC.C*=ONC:A8CA 7 *.,4
$? taw #20Dw ':O's 373-4093 "T. [
Director Office of Management Information d/
[
Ogg b7377w and Program Control wJ I-U. S. Nuclear Regulatory Commission y
- 2 Washington, D. C.
20555 e
h
/
RE: Oconee Nuclear Station Docket Nos. 50-269, -270, -287 C
Dear Sir:
Please find attached information concerning the peiformance and operating status of the Oconee Nuclear Station for the month of November, 19/7. During the period Oconee Nuclear Station has been in operation the maximum dependable capacity has been changed from 820 M'ie for the period July 16, 1973 through November 8, 1973 to 887 MWe for the period November 8, 1973 through December 31, 1973 to 871 MWe for January, 1974 through December, 1976 and to 860 MWe for January 1977 to present.
In previous Monthly Operating Reports the cumulative capacity factors, defined as the cumulative net generation divided by maximum dependable capacity times cumulative period hours, have been calculated using the maximum dependable capacity current at that time.
Beginning with this report, November, 1977, the cumulative capacity factors will be calculated using a weighted maximum dependable capacity which will reflect the past variations in this number.
Very truly yours, duaG.skc-N.
/.
// William O. Parker, Jr. V JAR:ge Attachment cc:
Mr. Norman C. Moseley 773500028 L_