OPERATING DATA REPORT DOCKET NO. 50-269 DATE 07-17-78 COMPLETED BY J. A. Reavis TELEPHONE (704) 373-8552
- OPERATING STATUS Notes
- 1. Unit Name:
Oconee Unit 1 Year-to-date & cumulative
- 2. Reporting Period: June, 1978 pa f
are ca h 2568
- 3. Licensed Thermal Power (MWr):
lated using a weighted aver-934
- 4. Nameplate Rating (Gross MWe):
age for maximum dependable
- 5. Design Electrical Ratmg (Net Mbe): 887 capacity.
899
- 6. Maximum Dependable Capacity (Gross MWe):
860
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rt. port. Give Reasor:s:
None
- 9. Power Level To Which Restricted,if hy (Net MN):
None
- 10. Reasons For Restrictions.If Any:
This Month Yr..to.Date Cumulative 720.0 4,343.0 43,464.0
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor was Critical 546.3
_ 3,404.2 31,143.3
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 533.5 3.366.0 28,787.7
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1,306,959 8,454,226 67,077,081
- 17. Gross Electrical Energy Generated (MWH) 456,160 2,952,420 23,262,060
- 18. Net Electrical Energy Generated (MWH) 432,115 2,811,883 21,988,810
- 19. Unit Semce Factor 74.1 77.5 66.2 74.1 77.5 66.3
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 69.8 75.3 58.5
- 22. Unit Capacity Factor (Using DER Net) 67.7 73.0 57.0
- 23. Unit Forced Outage Rate 25.9 22.5 19.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
Refueling August 20, 1978 - 6 Weeks
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY j
INITIAL ELECTRICITY l
COMMERCIAL OPERAT:ON 7 912170 $O8 (C/7? )
IINil SilillDOWNS ANDl' owl.R Hl'IsilfilONS I"
I UN-UNil NAhll' _Oconee_ Unit __1.,
D All-: _0Z-.17-78 R I.p O R I bl O N ill June. 1978 COMPI 1:ll.D fly J._A.._R eavi s.._.
11:1.I.PilONt! _(2DO373-855L c
jE
'h jE 1.icemcc 3 e, h
Cause & Courtlive j s e}
No.
Date 3g j
I.ven 3, y ei At tion to H
fE y
jg Itcpose e mt,
]'
pseveni Rionten c 6
12 78-06-01 F
6.10 A
3 Hit VALVEX The emergency dump valve (llD-28) on "B" moisture separator drain tank failed to function properly causing a high level trip.
13 78-06202 F
D RC FUELXX Xenon hold at 90% power 14 78-06-15 F
-180.39 A
1 CA VALVEX Pressurizer sample line valve (RC-16) packing leak.
Replaced valve.
15 78-06-23 F
D RC FUELXX Xenon hold at 76% power 16 78-06-25 F
D RC FUELXX Xenon hold at 90% power a
l 2
1 l
1: l'os t cil Reason:
AlcIllotl:
l Allil'il 6 Imi'"' 8i""5 S Sthetinteil A Iip.in m ers itailme (1 splain)
I hla'"8al I"' E8 cP "a'i"" "I D "d ll.hlawien. int e of t est 2 Alannal Scram.
1:nto Sheets lin 1.itenu c C.Reineling 1 Antoniatic Straps.
lient Repo8: ll 1 lu l ele INIlltI G-D.Regelasmy Resteireion l Other (lixplain) 01(* l I l -Opes.ilor leaining.t I.it ense f.xamination l'. Ailmanislealive 5
G 1)pciational 1:nos (l:xplain)
I.shibit 1 S.une Somcc l's/7 / )
Il-Olhes (limplain)
AVERAGE D AILY L* NIT POWER LEVEL 50-269 DOCKET NO.
IJNIT Oconee Unit 1 j
DATE 07-17-78 e
COMPLETED BY J. A. Reavis TELEPHONE (704) 373-8552 MONg JUNE. 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net)
(MWe-Net i j
554 3
710 18 821 3
9 4
860 20 858 5
,3 854 6
7 840 23 198 S49 651 8
24 853 733 9
'S 10 861 26 836 859 859 11 7
J 12 85'6 2S 860 13 854 29 861 853 859 14 30 15 764 33 16 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
l l
l (9/77) l
hvaTHLY REFUELING INFORMATION RE0 VEST 1.
Facility name:
Oconee 1 2.
Scheduled next refueling shutdown:
August 20, 1978 3.
Scheduled restart following refueling:
October 8, 1978 4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes If yes, what will these be? Amendment to incorporate technical specifica-tions for Oconee Nuclear Station Unit 1, Cycle 5.
Submitted June 26, 1976.
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
If no, when is review scheduled?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
l 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool: _l] ?
8.
Present licensed fuel pool capacity:
306 i
Size of requested or planned increase: No increase planned.
9.
Projected date of last refueling which can be accommodated by present j
licensed capacity: 3/3/80 assuming no transfers to McGuire.
l l
-DUKE POWER COMPANY Date:
July 17. 1978 Name of
Contact:
Jerel A.
Renvis
DOCKET NO:
50-269 UNIT.
Oconee Unit 1 DATE:
07-17-78 NARRATIVE
SUMMARY
MONTH: June, 1978 Oconee 1 began the month of June at 95% power due to a high condensate flow condition exce.. ling normal capacity of the polishing demineralizer cells. On June 1, 197P, at 16:04 hours, the turbine tripped due to a high level in the
'T "B" MSDT caused by the failure of valve HD-28 (emergency dump valve) to function properly.
The reactor tripped from high pressure. The unit was returned to service at 22:10 hrs. and after normal holds, reached near rated power on June 3, 1978. On June 15, 1978, the unit was removed from service because of packing leakage on valv? RC-16 (pressurizer sample line). The valve was replaced and the unit returned to service on June 23, 1978 at 12:08 hrs. After xenon holds, near rated power was reached on June 26, 1978.