DOCKET NO:
50-269 UNIT: Oconee Unit 1 j
DATE:
05-15-78 NARRATIVE
SUMMARY
{
)
MONTH: April, 1978 Oconee 1 began the month of April at near rated power.
On 4/17 power was reduced to 91% for maintenance on the 1D2 heater drain pump. The unit was returned to near rated power the same day.
On 4/21 the unit was removed from service because of a leak in the "B" OTSG.
It remained out of service the duration of the month.
4 1
L 9
T d
n N
- \\
4'
.~
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name:
Oconee Unit 1 2.
Scheduled next refueling shutdown:
October 15. 1978 3.
Scheduled restart following refueling:
December 3, 1978 4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? ye.
If yes, what will these be? Amendment to incorporate technical snecifications for Oconee Nuclear Station. Unit 1 Cvele 5.
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
If no, when is review scheduled? __
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
September 1, 1978 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool: 141 8.
Present licensed fuel pool capacity:
306 in Oconee 1 & 2 pool Size of requested or planned increase:
nn 4ncro,c, n1,nnoa I
9.
Projected date of last refueling which can be accommodated by present licensed capacity: 3/3/80 DUKE POWER COMPANY Date: May 15, 1978 i
l l
Name of
Contact: