UNIT Ocon u Unit 3
~
DATE 1/10/77 DOCKET NO.
50-287 PREPARED BY L. J. Bare OPERATING STATUS 1.
REPORTING PERIOD: December 1 THROUGH December 31, 1976 GROSS HOURS IN REPORTING PERIOD:
744.0 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
871 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.
REASONS FOR RESTRICTION (IF ANY)
This Month Year to Date Cumulative 5.
NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 6258.4 13402.7 6.
REACTOR RESERVE SHUTDOWN HOURS 7.
HOURS GENERATOR ON-LINE 744.0 6074.8 13023.5 8.
UNIT RESERVE SHUTDOWN HOURS 9.
GROSS THERMAL ENERGY GENERATED (MWH) 1910406 14450167 30368217 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 671760 4994530 10439444 11.
NET ELECTRICAL ENERGY GENERATED (MWH) 645184 4755208 9933642 12.
REACTOR SERVICE FACTOR 100.0 71.3 74.8 13.
REACTOR AVAIIABILITY FACTOR 100.0 69.4 75.4 14.
UNIT SERVICE FACTOR 100.0 69.2 72.6 15.
UNIT AVAILABILITY FACTOR 100.0 69.2 72.6 16.
UNIT CAPACITY FACTOR (Using Net 99.6 62.2 63.6 Capability) 17.
UNIT CAPACITY FACTOR (Using Design Mwe) 97.8 61.0 6 2. 5' '
18.
UNIT FORCED OUTAGE RATE 0
16.8 14.0 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STlaTUP:
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI. X 100 1100RS IN REPORTING PERLOD REACTOR AVAILABILI1Y FACTOR = HOURS RT_\\CTOR L'AS AVAIL \\GLE TO' OPERATE IICURS IN REFORTING PERIOD UNIT SERVICE FACTOR
= HOITS CT.?:ERATOR ON T.T NE HOURS IN REPORIING PTRIOD UNIT AVAIL \\BILITY FACTOR = UOURS UNTT WAS A'!AI1.\\31.E TO CrNERATE X 100 HOURS IN REPORTING PERIOD UNIT CAI'ACITY FACTOR
= NET ELECTRICAL P0hER GI.NT.RATFD (Net C.ipability or Desir,n (Mwe-L L).1 X Il0URS IN Rt:Ptet."* h PERIOD y h] 9 i UNIT FORCD OUTACE RAIS = FORCrD OUTAGE HOURS H5BisTEiisiffriiii ON i.INE + F0nceb =>
u,
DdCKET NO. 50-287 Oconee Unit 3 UNIT SHUTDOWNS UNIT N AMii 1/10/77 DATli RI! PORT MONTil December, 1976 TYPE METitOD OF F-FORCED DURATION SHUTTING DOWN NO.
DATE S SCilEDULED (1100RS)
REASON (1)
Tite REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS
-1 (I) REASON (2) METilOD A -EQUIPMENT F AILUME (EXPLA!N) 1-MANUAL B - M AINT. OR 1 EST.
2-MANUAL C. RLi'UL LING SCRAM D-REGULATORY RESTRICTION 3-AUTOM ATIC E-OPER ATOR TR/.3NING AND SCRAM LICLNSE EXi.MINATION 4-Other F-ADMINISTR AllVL G-OPLR ATIONAL LRROR (LXPLAIN) ll-OlllLR (EXPLAIN) l l
SUMMARY
No outages this month.
m
~
3 DOCKET NO. 50-287 oconee Unit 3 UNIT 1/10/77 DATE AVERAGE DAILY UNIT POWER LEVEL MONTH December, 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 868 1
859 17 867 862 18 2
863 856 39 3
866 874 g
4 870 861 21 5
871 868 6
22 865 7
23 0
861 8
24 861 9
25 879 861 10 26 866 862 27 11 868 871 12 28 873 869 29 13 872 871 30 14 871 871 31 15 16 868 l
DAILY UNIT POWER LEVEL FORN1 INSTRUCTIONS On this form, list the average daily unit power level in AlWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usini, maximum dependable capacity for the net electrical rating of the unit. there may be measions when the daily average power level exceeds the 1007c line (or the restricted power lesel line). In such eases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.