ML19317E305
| ML19317E305 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 07/12/1978 |
| From: | Office of Nuclear Reactor Regulation |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7912170526 | |
| Download: ML19317E305 (2) | |
Text
~
by.,gd]
0 770 g
7 37
%g, x W
iCORAUDU'l FOR:
R. Reid, Chief, Operating Reactors Branch !?o. 4 Division of Operating Reactors FRO;l:
Acting Branch Chief, Engineering Branch Division of Operating Reactors SUDJECT:
REQUEST FOR ADDITIOML It:r0RinTION REGARDING SLEEVING OF GCONEE UNIT 1, 2, AND 3 i
STEN! gel:EPATOR TUDES (TAC 7599)
The Engineering Cranch, Division of Operating I'eactors, has revie',:ed Cu!:e Power Conpany's subnittal dated i!ay 6,1978 entitled
" Technical Justification for Installing and Testing Tube Sleeves in Oncc-Through Steca Generators". This docunant proposes a tube sleeving prograa for the Oconec steam generators. The additional infonation rcr;uested in the attachnent is required before t;e can conplete our revicw.
Acting Branch Chief Engincering Branch Division of Operating Reactors cc:
V. Stello
- 3. Grices D. Eisenhut J. Knight B. D. Liaw J. Gaibert k,,
R. Cudlin
- 11. Fairtilo i
J. Strosnider 781920342
,ii
,,n)
EB:f0 (
fC,:EB:00Rh-EB:00Rpf_
BDLikw A~c't'iEg Dhief c e ne c,
JStroshider
,,,m, 7/!-/78 7/ O/78 7/',/78 t
3 912170 ((h [
- v. s. = v-~ ~ r u ~ r~ o r " = c i e 7. -. 2 <- 2 4
.uc iora. ns o. o ac>t o:40
\\
REQUEST FOR ADDITIO!!AL INFORMATION FROM DUKE POWER COMPA!1Y REGARDlflG STEAM
%g GEllERATOR TUBE SLEEVIllG AT
.gpv OC0!1EE UNITS 1, 2, AtlD 3 Provide appropriate technical specifications governing pre-installation, 1.
post installation, and inservice inspections of the sleeves and sleeved These specifications should include inspection techniques, tubes.
inspection frequencies, and reporting requirements.
Since the sleeves will not function as a part of the primary pressure boundary, it is our understanding that the 40% plugging criteria will remain in effect unless otherwise justified.
Describe the procedures t' hat will be used to ensure the quality of 2.
the retaining collar to tube welds.
Discuss how the operating time of the t=tellite test fixtures in the i
3.
Alliance Research Center model boilers will correlate with the actual operating time of the Oconee Unit i steam generators.
Specify which tubes are to be sleeved and at what elevation the sleeves 4.
are going to be installed during the Fall,1978 refueling outage.
I O
h L