ML19317E295

From kanterella
Jump to navigation Jump to search
Forwards LER 78-020/03L-0
Date released: 11/27/2019 Download: ML19317E295


LER 78-020/03L-0:on 780829,during Steady State Operation, Valve LPSW-21 (Reactor Bldg Cooling Unit 1B Cooling Water Discharge Valve)Failed to Operate Properly.Caused by Misalignment of Gearing Between Valve & Operator
ML19317E297
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/29/1978
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317E297 (2)
Forwards LER 78-020/03L-0
ML19317E291
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/29/1978
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317E291 (2)