ML19317E066

From kanterella
Jump to navigation Jump to search
Forwards Abnormal Occurrence AO-269/74-04
Date released: 11/27/2019 Download: ML19317E066


Abnormal Occurrence AO-269/74-04:on 740222,B Core Flood Tank Pressure Inadvertently Increased.Caused by Operating Procedure Deficiencies.Tank Pressure Reduced & Procedure Modified
ML19317E067
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/05/1974
From:
DUKE POWER CO.
To:
References
Download: ML19317E067 (2)
Forwards Abnormal Occurrence AO-269/74-04
ML19317E065
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/06/1974
From: Thies A
DUKE POWER CO.
To: GIAMBUSSO A
US ATOMIC ENERGY COMMISSION (AEC)
References
Download: ML19317E065 (2)