ML19317D751

From kanterella
Jump to navigation Jump to search
Forwards Integrated Leak Rate Test of Reactor Containment Bldg & Structural Integrity Test Rept of Reactor Containment Bldg. W/O Encls
ML19317D751
Person / Time
Site: Oconee 
Issue date: 10/27/1971
From: Thies A
DUKE POWER CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7912100517
Download: ML19317D751 (1)


Text

b

[)

^

/

DUKE PowEn COMPANY Powna Bert.orno Rogulatrf F!'3 Cy.

4aa SouTu Caunca SrazzT, CuunzoTTz, N. C. asson A.C. Dires se..oa v.ca P.esios.r P. o. Box as7e p.oow.o.

o r=......

['

Q. N.

7 8

S October 27, 1971 j./ '

i'f Qc&., '.

'O.

~

,~

/

- t:

.Ml Qt 'h %,g #

4 N

Dr. Peter A. Morris, Director V

Division of Reactor Licensing

  • i S

Atomic Energy Commission 4,

', h Washington, D. C.

20545 16

Reference:

Oconee Nuclear Station Unit No. 1 Docket No. 50-269

Dear Dr. Morris:

In connection with the Preoperational Test Program for Oconee Nuclear Station Unit No. 1, which is under construction pursuant to provisional construction permit CPPR-33, Duke Power Company submits herewith copies of the following reports in compliance with Technical Specifications 6.6.4.7b and 6.6.4.7d:

1.

Integrated Leak Rate Test of the Reactor Containment Building 2.

Structural Integrity Test Report of the Reactor Containment Building i

Three copies of each report are attached. Thirty-seven copies of each report are being transmitted under separate cover.

Sincerely, J'

[',/, ',sCwo

+ f, o

A. C. Thies q\\

D KSC:vr i,Cy'30 v,'

Attachments g

L,)

2 NOV1 jyn h^>.oc?lfcim;,~h mian J u

cr 7912100 f/7 c

h,