ML19317D750
| ML19317D750 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/30/1971 |
| From: | Thies A DUKE POWER CO. |
| To: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7912100515 | |
| Download: ML19317D750 (1) | |
Text
.
Dunz POWER COMPANY Powra Dan.orwo 4aa SouTn Cuuncu SrazzT, CuAntorrz, N. C. assot A. C. Tnr es 5s=*om vice Pogssotar p O. Box 2176 peoovction ano Teamsmessw.m Regulatory File Cy.
September 30, 1971 I'\\
e d.'Tjij,s of>
p
/
Dr. Peter A. Morris, Director Division of Reactor Licensing Q
00."i
$.. 'Ni c..
Atomic Energy Commission E/h,, '.,, Mn A
,s(
Washington, D. C.
20545 c,
Reference:
Oconee Nuclear Station
.4 m\\ ',
Unit No. 1 n73 Docket No. 50-269
Dear Dr. Morris:
In connection with the Preoperational Test Program for Oconee Nuclear Station Unit No. 1, which is under construction pursuant to provisional construction permit CPPR-33, Duke Power Company submits herewith copies of the following report in response to requests by your staff:
" Description of Cause and Correction of Damage to Control Rod Drive Mechanisms During Preoperational Testing of Oconee No. 1" Three copies of this report are attached. Thirty-seven copies are being transmitted under separate cover.
This report was written to document the activities associated with control rod drive damage which occurred during initial checkout of the drives as part of the Preoperational Test Frogram for Ocenee Unit No. 1.
Sincerely, N
~
A. C. Thies i'R" A
PHB:vr
%, OCT4 197; w 75 Attachments erc m y g
~
Q
%!L SECTIcN f xcm cuan g
D a
7 91210 0 E/F 33
,4 s