ML19317D723
| ML19317D723 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/21/1972 |
| From: | Thies A DUKE POWER CO. |
| To: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19317D724 | List: |
| References | |
| NUDOCS 7912100491 | |
| Download: ML19317D723 (2) | |
Text
m
?equiato o rile Cy.
c 1
DECE POWER COMPANY Powrn Buzz.omo 4aa Sourn Cuuncu SrazzT, CHARIDTTz,N C. asaos s s =,o. v)c e E O'" " ****
- sioen, PaoawcTion amo Teansneissio%
y
?
h
/ **
I g
D-
/
~
April 21, 1972 AP,y20 t-li:
6-p 1
"k L
'^
,c,
j%
9 0
~ ~ ~, -
pL Dr. Peter A. Morris, Director
\\n W
Division of Reactor Licensing b
. E UJN_.
Atomic Energy Commission Washington, D. C.
20545 N Q,,,
Reference:
Oconee Nuclear Station Unit Nc. 1
" Integrated Leak Rate Test of the Reactor Containment Building" Report Docket No. 50-269
Dear Dr. Morris:
In response to Mr. R. C. DeYoung's letter of January 12, 1972, Duke Power Company submits the following revision for the Oconee Nuclear Station Unit No. 1, " Integrated Leak Rate Test of the Reactor Building" report:
Integrated Leak Rate Test of the Reactor Containment Building Revision No. 1 April 21, 1972 This revision encompasses, (1) the addition of the Penetration No. 38 Leak Rate and the Emergency Lock Leak Rate, and (2) the correction of mathematical and typographical errors.
Duke Power Company has also revised the " Reactor Building Integrated Leak Rate Test Procedure" so that all isolation valves will be closed by their i
normal mode of actuation.
Three signed copies of the revision are enclosed and 37 copies of the revision are transmitted herewith.
Sincerely,
[
A. C. Thies I
l ACT:vr e~ o m Enclosures 4W' 7912100h/
m
'N*du!r M -v r;Ie Cy.
DUKE POWER COMPANY OCONEE NUCLEAR STATION UNIT 1 DOCKET No. 50-269 M.~:0t.0_.:*Y-2/_7Q INTEGRATED LEAK RATE TEST l
OF THE REACTOR CONTAINMENT BUILDING Revision No. 1 April 21, 1972 CHANCES AND CORRECTIONS:
1.
Remove and insert pages in accordance with tabulation below.
j (Please note that vertical lines in each margin and the revision number in the right margin identify portions revised unless otherwise noted at bottom of page.)
Remove the Followfna Sheets Insert the Following Sheets:
Pages:
1-1, 1-2, 1-L Pages:
1-1, 1-2, 1-3 Pages:
5-1, 5-2, 5-3, 5-4 Pages:
5-1, 5-2, 5-3, 5-4 I
,--o 4 -.
---n
~ ~ - -, -,.
- -, --.,