Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 06/02/1975 |
From: | Thies A DUKE POWER CO. |
To: | Giambusso A US ATOMIC ENERGY COMMISSION (AEC) |
Shared Package | |
ML19317D658 | List: |
References | |
NUDOCS 7912060889 | |
Download: ML19317D657 (1) | |
Similar Documents at Oconee | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML15113A7671999-10-27027 October 1999
[Table view]Informs That NRC Will Not Be Able to Issue Final Safety Evaluation for BAW-2248 Until mid-Nov Because of Scheduler Conflicts & Workload Priorities ML15261A2421999-10-13013 October 1999 Informs That on 990930,staff Completed mid-cycle PPR of Oconee Nuclear Station.No New Areas That Warranted More than Core Insp Program Over Next Five Months Identified. Historical Listing of Plant Issues Encl ML15112A7741999-10-0505 October 1999 Requests Addl Info Re Aging Effects of Insulated Cables & Connections for Plant,Based on Insp Findings Noted in Insp Repts 50-269/99-12,50-270/99-12 & 50-287/99-12 and License Renewal Application ML15113A7511999-09-23023 September 1999 Concludes That All Info Requested by GL 98-01 & Suppl 1 Re Y2K Readiness of Computers at NPPs Provided by Util & GL 98-01 Considered Closed for Ons,Units 1,2 & 3 ML15261A4221999-09-21021 September 1999 Forwards Insp Repts 50-269/99-12,50-270/99-12 & 50-287/99-12 on 990602-0730.No Violations Noted.Insp Revealed That,In Most Cases,Existing Aging Mgt Programs,Implemented as Described in Licensee Application ML15113A7521999-09-21021 September 1999 Informs That Util 980326 Response to GL 97-06, Degradation of Steam Generator Internals Acceptable ML15261A2411999-09-17017 September 1999 Confirms 990916 Telcon Between L Nicholson of Licensee Staff & R Carroll of NRC Re Mgt Meeting to Be Conducted on 991006 in Atlanta,Ga to Discuss Licensee Status of Ongoing Improvement Initiatives at Oconee Nuclear Station ML15113A7481999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Imposed by RG 1.147,Rev 12,acceptable Since Evaluation on Original Relief Based on Implementing Code Case for Duration of Insp Interval & That 990522 Request Valid ML15112A7521999-09-10010 September 1999 Forwards SE Accepting Licensee 990806 Request for Relief to Use Alternative Rules of ASME B&PV Code on Certain Weld Matls in Replacement SGs Being Manufactured for Plant ML15261A4181999-09-10010 September 1999 Forwards Insp Repts 50-269/99-05,50-270/99-05 & 50-287/99-05 on 990704-0814.Ten Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML15112A7611999-09-0909 September 1999 Forwards Safety Evaluation of Unresolved Safety Issue A-46 Program Implementation,Including Plant Hydro Station & Switchyard ML15261A2391999-09-0707 September 1999 Discusses 990825 Meeting in Atlanta,Ga Re Results of Recent Duke Power Co Fire Endurance Testing of Penetration Seals. List of Attendees & Presentation Handouts Encl ML15261A2371999-09-0101 September 1999 Submits Traning Manager Conference Meeting Summary of Meeting Conducted on 990812-13 on Recent Changes to Operator Licensing Program.List of Attendees & Matl Used in Presentation Enclosed ML15112A7411999-08-30030 August 1999 Forwards Request for Addl Info Re Util 990727 Requested Amend to Oconee Nuclear Station,Units 1,2 & 3 Tss.Amend Would Incorporate Keowee Hydro Unit Voltage & Frequency Protection Mod Surveillance Requirements ML15261A2711999-08-11011 August 1999 Discusses 990730 Open Meeting Conducted at Region II Request Re Continuing & Planned Engineering Activites.List of Meeting Attendees & Copy of Presentation Handout Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML15261A2721999-08-0909 August 1999 Confirms 990803 Telcon Re Mgt Meeting to Be Conducted on 990825 to Discuss Results of Recent DPC Fire Endurance Testing of Penetration Seals ML16134A5591999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML15113A7311999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Responses to GL 96-05, Periodic Verification of Design-Bases Capability of Safety-Related Movs, Issued on 960918 ML15261A4151999-07-30030 July 1999 Forwards Insp Repts 50-269/99-04,05-270/99-04 & 50-287/99-04 on 990523-0703.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML15261A2701999-07-14014 July 1999 Confirms Telcon Between Je Burchfield & Re Carroll on 990708 Re Mgt Meeting Scheduled 990730 in Atlanta Ga.Purpose of Meeting to Discuss Status of Open EFW Insp Items & Engineering Initiatives ML15113A7151999-07-13013 July 1999 Forwards Audit Rept on Y2K Contingency Planning Program for Plant Conducted on 990608-09,as follow-up to GL 98-01 ML15261A2681999-07-0202 July 1999 Confirms 990701 Telcon with L Nicholson Concerning Emergency Operating Procedures Meeting.Informs That Meeting Has Been Scheduled for 990722 ML15113A7101999-07-0101 July 1999 Forwards SE Granting Third 10-yr Interval ISI Program Plan Request for Relief 98-03.Relief Would Allow Credit to Be Taken by Plant for Limited Ultrasonic Exams on Specific Pressurizer Sensing nozzle-to-vessel Welds ML15254A1711999-06-30030 June 1999 Forwards Biological Assessment to Evaluate Whether Proposed Renewal of Oconee Nuclear Station,Units 1,2 & 3 Operating Licenses for Period of Addl 20 Years Would Have Adverse Effects on Listed Species ML15261A2671999-06-28028 June 1999 Discusses 990621 Meeting at Oconee Facility Re Results of Most Recent Periodic Plant Ppr.List of Attendees Encl ML15113A7071999-06-24024 June 1999 Discusses GL 92-001,Rev 1, Suppl 1, Reactor Vessel Structural Integrity ML15112A5111999-06-23023 June 1999 Refers to Oconee License Renewal SER Sent on 990616.Informs That Number of Copies Were Missing Pages 3-173 & 3-185. Forwards New Pages 3-173 Through 3-186 That Should Replace Existing Pages 3-174 Through 3-186 IR 05000269/19990031999-06-17017 June 1999 Forwards Insp Repts 50-269/99-03,50-270/99-03 & 50-287/99-03.Violations Being Treated as Noncited Violations ML15112A5001999-06-16016 June 1999 Forwards SER Re Licensee 980706 Application to NRC for Renewal of Oconee Nuclear Station,Units 1,2 & 3 Operating License for Addl 20 Years.Open Items Must Be Resolved Before NRC Can Make Final Determination on Application ML15261A2651999-06-15015 June 1999 Discusses 990526 Meeting Re Results of 1st Oconee License Renewal Insp.Forwards List of Attendees & Presentation Slide ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML15112A4961999-06-0808 June 1999 Forwards SE of TR DPC-NE-2005P, Use of BWU-Z Critical Heat Flux Correlation for Mark-B11 Fuel. Rept Acceptable ML15261A2631999-06-0202 June 1999 Provides NRC Decision on Licensee 980604 Request for Reconsideration of Violation B of NOV Issued on 980504 Re Timeliness in Reporting Design Basis Events or Conditions at Plant Facility ML15261A2641999-06-0202 June 1999 Informs That Meeting Re Performance of Oconee Nuclear Station Will Be Held on 990621 ML15112A4861999-05-25025 May 1999 Forwards SER Accepting Rev 1 to Topical Rept DPC-NE-3005-P, UFSAR Chapter 15 Transient Analysis Methodology Submitted by Ltr ML15261A4061999-05-24024 May 1999 Forwards Insp Repts 50-269/99-11,50-270/99-11 & 50-287/99-11 on 990426-30.No Violations Noted.Scoping & Screening Portion of License Renewal Activities Were Conducted as Described in License Renewal Application ML15112A4821999-05-21021 May 1999 Discusses Request That Topical Rept DPC-NE-3005-P,Rev 1, UFSAR Chapter 15 Transient Analysis Methodology, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML15253A5091999-05-18018 May 1999 Submits NRR mgt-approved Survey Re Hydrogen Storage at Operating Nuclear Plants.Requests That Project Managers Contact Licensees to Conduct Listed Survey & That Rept Be Submitted by Close of Business on 990528 ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML15261A2601999-05-17017 May 1999 Confirms 990510 Telcon with E Burchfield Concerning Public Meeting Scheduled for 990629.Purpose of Meeting to Discuss Results of NRC Most Recent PPR of Plant ML15261A2591999-05-12012 May 1999 Discusses 990421 Meeting Conducted by NRC to Discuss Analysis Methodology Supporting Plant License Renewal Application.List of Meeting Attendees & Presentation Handouts Encl ML15113A6811999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Div of Licensing Project Mgt Created.Rl Emch Section Chief for Oconee.Reorganization Chart Encl ML15261A2611999-05-10010 May 1999 Responds to from Util to NRC Re Upcoming NRC Insp of Emergency Operating Procedures at Oconee Nuclear Station & Util Request That NRC Concur That Planned Insp Will Be Based on Oconee Licensing Basis ML15261A2551999-05-10010 May 1999 Confirms Telcon Between Je Burchfield & C Julian Re Meeting to Be Conducted on 990526 for NRC to Present Results of NRC First Inspection of Oconee License Renewal Program Conducted 990426 ML15217A2091999-05-10010 May 1999 Discusses Determination of Scope of Transmission Lines Impact Assessment for License Renewal.Impacts Resulting from Maint Activities Associated with 330 Miles of Transmission Lines Cited in Original Fes in Suppls to GEIS ML15261A4031999-05-0505 May 1999 Forwards Insp Repts 50-269/99-02,50-270/99-02 & 50-287/99-02 on 990228-0410.Five Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML15113A6781999-04-26026 April 1999 Informs That Effective Immediately NRC Project Management Responsibility for Oconee Nuclear Station License Renewal Application Assigned to Jm Sebrosky.All Other Issues Related to Oconee Remain Responsibility of DE Labarge ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20209H6921999-07-15015 July 1999
[Table view]Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20207C0501999-02-25025 February 1999 Submits Annual Rept Specifying Quantity of Each of Principal Radionuclides Released to Environment in Liquid & Gaseous Effluents,Per 10CFR72.44(d)(3).Effluent Release from ISFSI for CY98 Was Zero ML20198Q8971998-12-17017 December 1998 Expresses Concerns Re License Renewal of Duke Energy,Oconee Nuclear Station,Units 1,2 & 3.Commends NRC on Steps Agency Has Undertaken to Conclude Renewal Process.With Certificate of Svc.Served on 990107 05000269/LER-1998-012-01, Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date1998-12-0303 December 1998 Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date 05000269/LER-1998-013, Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 9812021998-11-0202 November 1998 Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 981202 ML20155B1481998-10-21021 October 1998 Informs That as Result of Discussion of Issues Re Recent Events in Ice Condenser Industry,Ice Condenser Mini-Group (Icmg),Decided to Focus Efforts on Review & Potential Rev of Ice condenser-related TS in Order to Clarify Issues ML20154B9421998-09-30030 September 1998 Amends Chattooga River Watershed Coalition Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew OLs for Oconee Nuclear Station,Units 1,2 & 3 ML20154A8971998-09-30030 September 1998 Requests That Submitted Info Be Attached to Amends to Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew Operating Licenses for Units 1,2 & 3 ML20153H6881998-09-27027 September 1998 Requests Consideration of Motion to Enlarge Time Required to Submit Amended Petition to Intervene in Proceeding Re Application of Duke Energy Corp to Renew OLs for Facilities ML20153E4721998-09-24024 September 1998 Forwards Notices of Appearances for Attorneys Representing Duke Energy Corp,Applicant in Proceeding for License Renewal of Oconee Units 1,2 & 3.With Certificate of Svc ML20151S7501998-08-31031 August 1998 Provides Update on Commitment Made by Licensee in Response to NOV & Imposition of Civil Penalty Re Valves in Ldst Instrument Lines That Were Incorrectly Translated Into Station Procedures ML20236V9581998-07-27027 July 1998 Forwards Corrected Pages 3.5-30b of 961211 & 3.16-2 of 970205 TS Bases.Old Amend Numbers Were Left on Pages.Rev Changes Footer on Both Pages to Reflect Bases Changes ML20153D1961998-07-0909 July 1998 Requests NRC Reconsider & Grant Util Request for Exemption from Duplicative License Fee Under 10CFR171.11(d) for Storage of Spent Nuclear Fuel at Oconee Nuclear Station ML15112A6541998-07-0101 July 1998 Forwards OLRP-1002, License Renewal Flow Diagrams,Oconee Nuclear Station Units 1,2 & 3, Vol I.Flow Diagrams Prepared to Aid in NRC Staff Review of Application for Renewal of License,Which Will Be Submitted Shortly.W/Oversize Drawings ML20247G0881998-05-14014 May 1998 Provides Rev 2 to Section 3.3, Instrumentation, in Support of TS-362 Amend Request.Position on Testing of Analog Trip Type Instruments W/Regard to Transition from CTS to ITS, Restated.Summary Description of Its/Bases Changes,Encl 05000269/LER-1998-002-01, Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown1998-04-30030 April 1998 Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown ML20217G0351998-03-26026 March 1998 Submits Ltr to Update Commitment Made by Oconee in Response to Subject Violation.Update Assures That Details of Particular CA Are Appropriately Contained in Docketed Correspondence ML20203J9301998-02-26026 February 1998 Submits Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Suppl 1 to Bulletin Attached & Contains Listed Commitments 05000269/LER-1997-003-01, Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action1997-11-12012 November 1997 Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action ML20198Q5741997-11-0303 November 1997 Provides Suppl to Initial 971020 Application for Amend to TS Re SG Tubing Surveillance Requirements,In Response to NRC 971030 Request for Addl Info.Proprietary Rev 3 to BAW-2303P, OTSG Repair Roll Qualification Rept Encl.Rept Withheld ML20211F7981997-09-25025 September 1997 Submits Response to Violations Noted in Insp Repts 50-269/97-10,50-270/97-10 & 50-287/97-10 & Proposed Imposition of Civil Penalty in Amount of $330,000.Corrective Actions:Ldst Instrument Mods on All Three Units Completed ML16141B2371997-09-25025 September 1997 Forwards Ncmpa 1 Annual Rept for 1996, Per 10CFR50.71(b) ML20211C8021997-09-18018 September 1997 Forwards Revised TS Amend Re Reactor Bldg Structural Integrity.Previously Submitted TSs Contained Editorial Error ML20210T7121997-09-0404 September 1997 Informs That Representatives from Oconee Who Compose LERs Would Like to Meet W/Staff & AEOD at Convenient Place & Time to Facilitate Process.Concerns Addressed in Encl ML20149J4841997-07-21021 July 1997 Forwards Addl Pages to Rev 5 to Duke Power Co Nuclear Security & Contingency Plan. Encl Withheld ML20141F1381997-06-25025 June 1997 Forwards Rev 4 to Nuclear Security Training & Qualification Plan, Per 10CFR50.4 ML20140C9531997-06-0303 June 1997 Requests NRC Approval of Amend to Oconee ISFSI to Obtain Commission Approval of Proposed Rev 6 to Encl Physical Security Plan.W/O Encls ML20148C8621997-05-22022 May 1997 Informs That TR BAW-2241P Will Be Ref in Future Submittals of P/T Limit Curve Revs for B&W Plants as Result of 970519 Telcon Between L Lois & J Taylor ML20141K1981997-05-19019 May 1997 Forwards Rev 6 to Duke Power Co Nuclear Security & Contingency Plan.Encl Withheld,Per 10CFR73.21 ML20138G8981997-04-30030 April 1997 Forwards Rev 5 to DPC Security & Contingency Plan.Encl Withheld ML20138B3421997-04-22022 April 1997 Submits Response to Request for Addl Info Re Proposed Amend to Reactor Bldg Structural Integrity Tech Specs.Info Provided in Attachments 2 & 3 Supersedes Revised Pages & Markup Pages in Attachment 1 & 2,respectively ML20137N0231997-03-26026 March 1997 Forwards Revised TS 3.1.6 Bases Pages Deleting Detection Time of Reactor Bldg Air Particulate Monitor for RCS Leak of 1 Gpm ML20137B4731997-03-12012 March 1997 Forwards Rev 3 to Security Training & Qualification Plan.Rev Withheld,Per 10CFR73.21 ML20134P3831997-02-18018 February 1997 Submits Clarification of Design Basis Requirements at ONS for Permanently Installed Insulation in Response to NRC Bulletin 93-002, Debris Plugging of Emergency Core Cooling Suction Strainers ML20138L2101997-02-14014 February 1997 Forwards Monthly Operating Repts for Jan 1997 for Oconee Nuclear Station,Units 1,2 & 3 & Revised Monthly Operating Status Repts for Dec 1996 ML20134G5511997-02-0404 February 1997 Requests Exemption to Requirements of 10CFR70.24 Re Criticality Accident Monitoring,Per 10CFR70.14(a) & 70.24(d) ML20133M5971997-01-13013 January 1997 Forwards Revs to Oconee Selected Licensee Commitments Manual ML20138G8411996-12-26026 December 1996 Submits Supplementatl Info Re Emergency Power Engineered Safeguards Functional Test Amend Request ML20132F0911996-12-17017 December 1996 Forwards Response to 961212 & 13 Telcons Re Amend to Licenses for Proposed Changes to Updated Final Safety Analysis Rept Re one-time Emergency Power Engineered Safeguards Functional Test 05000269/LER-1996-008, Forwards Suppl to LER 96-008 Concerning Missed Valve Surveillance Which Resulted in Borated Water Storage Tank Technical Inoperability1996-10-31031 October 1996 Forwards Suppl to LER 96-008 Concerning Missed Valve Surveillance Which Resulted in Borated Water Storage Tank Technical Inoperability ML20134H2231996-10-30030 October 1996 Forwards Revised TS 3.7 Bases,Indicating Info Deleted ML20129B2571996-10-16016 October 1996 Submits Addl Info Re 960220 Application for Amends to Licenses DPR-38,DPR-47 & DPR-55 Concerning Proposed Rev to Chemistry TS Sections 3.1.5,3.1.10 & 4.1,in Response to NRC Telcon Request.Revised TS Pages Encl ML20128H2731996-09-19019 September 1996 Forwards Public Version of Rev 96-06 to Plant Emergency plan.W/961003 Release Memo ML20117D5691996-08-23023 August 1996 Requests Exemption for Ons,Units 1 & 2 & Cns,Units 1 & 2 Iaw/Provisions of 10CFR73.5, Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage ML20116F0051996-08-0101 August 1996 Forwards Corrected Page for Proposed Amend to TS Re Removal of Es Signal from Valves LPSW-4 & LPSW-5 ML20117E6031996-06-26026 June 1996 Forwards Public Version of Change 2 to RP/0/B/1000/01, Emergency Classification & Change 4 to RP/0/B/1000/22, Procedures for Site Fire Damage Assessment & Repair ML20112A0581996-05-14014 May 1996 Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment ML20115C4371996-05-13013 May 1996 Responds to NRC Bulletin 96-02, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment, ML20117D4931996-04-24024 April 1996 Submits Clarification of Reporting Requirements Under 10CFR50.72(b)(2)(vi) 1999-07-15 Category:UTILITY TO NRC MONTHYEARML16259A2391990-08-22022 August 1990
[Table view]Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo ML20059C1201990-08-20020 August 1990 Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement ML20063Q2671990-08-14014 August 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo ML15218A1151990-07-24024 July 1990 Forwards, Duke Power Co Master Decommissioning Trust Agreement for Oconee Units 1,2 & 3,McGuire Units 1 & 2, Catawba Units 1 & 2 ML20055C9851990-06-25025 June 1990 Forwards Rev 9 to Training & Qualification Plan.Rev Withheld ML16152A9841990-06-19019 June 1990 Forwards Revised Public Version of Rev 90-03 to Vol B of Epips,Including CP/2/A/2002/04C, Operating Procedure for Post-Accident Liquid Sampling, & Maint Directive 8.1 ML16152A9821990-06-14014 June 1990 Forwards Public Version of Rev 90-02 to Vol B to Oconee Nuclear Station Epips. W/Dh Grimsley 900627 Release Memo ML20044A4491990-06-14014 June 1990 Forwards Public Version of Rev 90-05 to Vol C to EPIP Manual. W/Dh Grimsley 900627 Release Memo ML20043E2571990-05-31031 May 1990 Forwards Request for Relief 90-01 from Requirements of Section XI of ASME Boiler & Pressure Vessel Code Re Inservice Insp During Second 10-yr Interval ML20043F4761990-05-30030 May 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Consisting of Rev 20 to CMIP-13 & Deletion of CMIP-15 & CMIP-17.W/900612 Release Memo ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML16152A9621990-05-0909 May 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7 & Rev 26 to CMIP-8.W/DH Grimsley 900517 Release Memo ML16152A9531990-05-0202 May 1990 Forwards Proprietary DPC-NE-2000P-A & Nonproprietary DPC-NE-2000-A, DCHF-1 Correlation for Predicting Heat Flux in Mixing Vane Grid Fuel Assemblies. Proprietary Rept Withheld ML20042H0321990-04-30030 April 1990 Forwards Public Version of Rev 90-04 to Vol C to EPIP Manual ML20034A8411990-04-10010 April 1990 Advises That Anticipated Walkdown of Plant,Per Resolution of USI A-46 Will Be Deferred Beyond 881007 Schedule & Reserves Right to Revise Implementation Schedule at Plant to Integrate Potential Future Requirements Into Single Program ML15217A1051990-03-26026 March 1990 Forwards Revised 1989 Annual Radiological Environ Operating Rept,Consisting of Revised Pages Summarizing Annual Liquid Dose Calculations ML20033F8771990-03-26026 March 1990 Forwards Rev to First Semiannual Solid Waste Rept 1989, Submitted Per .Rev Reflects Corrections on Number of Shipments & Total Vol of Compacted Dry Active Waste Shipped to Burial Site at Barnwell,Sc ML20012D6941990-03-21021 March 1990 Advises of No Human Engineering Discrepancy Mods of Safety Significance for Overall Operation of Plant,Per 880420 Commitment ML16152A9411990-03-14014 March 1990 Forwards Public Version of Rev 90-01 (Vol a) to Emergency Plan Manual & Revs 90-01 (Vol B) & 90-03 (Vol C) to EPIP Manual.W/Dh Grimsley 900329 Release Memo ML20012B4531990-03-12012 March 1990 Informs That Initial Spent Fuel Loading Schedule Has Been Delayed Until 900611 Due to Mfg & Delivery Delays.Updated SAR Will Not Be Submitted Prior to 900611 ML20012B3741990-03-0101 March 1990 Requests Extension to Respond to Generic Ltr 90-01 Re Participation in Regulatory Impact Survey Until 900402.Util in Process of Completing Questionnaires for All Units ML15217A1031990-02-28028 February 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation Manuals ML20012B4541990-02-21021 February 1990 Forwards Public Version of Vol C to Rev 90-02 to EPIP Manuals ML20012B3661990-02-21021 February 1990 Forwards Rev 1 to Cycle 12 Reload Rept,Changing Assumed RCS Flow & Correcting Typo ML20012B1691990-02-19019 February 1990 Forwards Public Version of Crisis Mgt Implementing Procedures,Including Rev 34 to CMIP-1,Rev 25 to CMIP-2, Rev 30 to CMIP-4,Rev 34 to CMIP-5,Rev 39 to CMIP-5 & Rev 38 to CMIP-7 ML19354E6711990-01-24024 January 1990 Requests Approval to Use Alloy 690 Plugs as Alternative to Requirements of 10CFR55(a),codes & Stds for Plants Prior to 900226 ML20006C7181990-01-22022 January 1990 Forwards Rev 30 to Security Plan.W/O Encl ML16152A9061990-01-19019 January 1990 Forwards Public Version of Rev 90-01 to Vol C to Oconee Nuclear Station Implementing Procedures Emergency Plan & Rev 89-03 to Vol a to Oconee Nuclear Station Emergency Plan. W/900131 Release Memo ML16152A9091990-01-18018 January 1990 Forwards Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. W/900131 Release Memo ML20005G1181990-01-0404 January 1990 Forwards Response to NRC Recommendations in 890828 Audit Evaluation Rept Re Safety & Performance Improvement Program. Util Fully Committed to Enacting Recommendations from Program Via B&W Owners Group Improvement Program ML20005G7601990-01-0404 January 1990 Forwards Public Version of Rev 33 to Crisis Mgt Plan. Privacy Info Should Be Deleted Prior to Placement in Pdr.W/ D Grimsley 900118 Release Memo ML20042D3731990-01-0202 January 1990 Forwards Revised Crisis Mgt Implementing Procedures, Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9, Rev 1 to CMIP-14 & Rev 30 to CMIP-21 ML19351A5721989-12-0707 December 1989 Withdraws Commitment to Install Cavitating Venturies or Any Other Mod to Relieve Operator Burden in Ensuring That Emergency Feedwater Pumps Protected from Runout in Postulated Accidents W/Low Steam Generator Pressurization ML20011D2411989-11-30030 November 1989 Forwards Revised Crises Mgt Implementing Procedures, Including Rev 23 to CMIP-2 & Rev 3 to CMIP-15 ML16152A8751989-11-21021 November 1989 Forwards Proprietary DPC-NE-2003P-A & Nonproprietary DPC-NE-2003-A, Core Thermal-Hydraulic Methodology Using VIPRE-01. Proprietary Rept Withheld ML19332C6571989-11-20020 November 1989 Advises That Listed Addl Protective Measures Will Be Provided for Auxiliary Svc Water Piping,Per ML16152A8731989-11-0101 November 1989 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8 & Rev 31 to CMIP-9.W/891020 Release Memo ML16152A8701989-10-30030 October 1989 Forwards Public Version of Rev 32 to Crisis Mgt Plan for Nuclear Stations. W/891113 Release Memo ML16152A8641989-10-18018 October 1989 Forwards Public Version of Revs 89-05 & 89-07 to Vol B & C, Respectively,Of Implementing Procedures Emergency Plan. W/891030 Release Memo ML19325D9811989-10-16016 October 1989 Forwards Update to Oct 1989, ISFSI Sar ML19351A2771989-10-13013 October 1989 Advises That Tech Spec Amend Request,Including Revised 15 EFPY Pressure/Temp Limits & Revised Low Temp Overpressure Protection Sys Operability Requirements Will Be Submitted by 891115,per Commitment in Re Generic Ltr 88-11 ML19325C9181989-10-0909 October 1989 Forwards Rev 8 to Training & Qualification Plan.Rev Withheld ML20248F1971989-09-29029 September 1989 Clarifies Tech Spec Rev,Consisting of Changes to App J Test Requirements for Valves CA-27,HP-155 & CF-47.All Lines Leading from Auxiliary Bldg to Valves HP-155 & CA-27 Maintained Normally Isolated Through Closed Manual Valves ML20246G9561989-08-23023 August 1989 Submits Details of Method for Reporting Findings Resulting from Design Basis Documentation Program,Per 890728 Meeting. Util Agrees to Submit LER for Each Finding Identified in Design Basis Documentation Program ML20245H4841989-08-0909 August 1989 Forwards Addl Info on DPC-NE-3000, Thermal-Hydraulic Transient Analysis Methodology, Per 890718 & 19 Telcons Re Steam Generator Heat Transfer Modeling W/Retran Code ML20245L6441989-08-0404 August 1989 Documents 890726 Conference Call Re Implementation Schedule for ATWS Mods.Proposed Schedule for Mods to Install ATWS Mitigation Sys Actuation Circuitry Based on Decision to Utilize Programmable Logic Controller ML20248C0091989-07-31031 July 1989 Advises That Response to Generic Ltr 89-06, SPDS, Will Be Delayed Due to Late Date of Receipt of Ltr.Submittal Anticipted by 890808 ML20247H4211989-07-25025 July 1989 Forwards Rev 29 to Security Plan.Rev Withheld ML20247K0211989-07-21021 July 1989 Responds to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment, Clarifying Info in .Use of Unqualified Components in Vent Paths for Valves Acceptable Based on Secondary Side Cooling ML20246G1711989-07-20020 July 1989 Submits Route Info for Shipment of Eight Irradiated Fuel Rods from Oconee to B&W Lynchburg Research Ctr in Sept 1989, Consisting of Single Shipment w/NLI-1/2 Spent Fuel Shipping Cask.Approval Requested by 890901 1990-08-22 |
Text
-
p.
n DuxE POWER COMPANY Powr.m BmLontt 422 Sourn Gnumen SrazzT, CnAmicrrz, N. C. asson O'
sanion v ca e scant PeoDUCTion AND Tnansasisseoh June 2, 1975 y*N P
h74 Mr. Angelo Giambusso, Director
~
Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287
Dear Mr. Giambusso:
Submitted herewith for your information is the Oconee Operator Licensing Program.
Very truly yours,
/
~~ 'C ~
.. ~ ~U b.L O.A I '.- p A.-
~
A. C. Thies
- $,rc
.x
~
ACT:vr
- ~
[
cygo g
Attachment
'3' 3 yy; fis75 Si g....,,.,c.i
&s a
\\
O Iog, n \\ &
7912060((p p
6/3/
-
Retrieved from "https://kanterella.com/w/index.php?title=ML19317D657&oldid=4793705"