ML19317D437
| ML19317D437 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/04/1977 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19317D433 | List: |
| References | |
| NUDOCS 7911290539 | |
| Download: ML19317D437 (2) | |
Text
-
'N
]
UNITED STATES NUCLEAR REGULATORY COM11SSION '
OI DOCKET NOS. 50-269, 50-270 AND 50-287 DUKE POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LIC MSES The U'.S. Nuclear' Regulatory Comission (the Commission) has issued Amendment Nos. 47., 47 - and 44 to Facility Operating. License Nos.
DPR-38, OPR-47 and DPR-55, respectively, issued to Duke Power Company _
which revised the Technical Specifications for op.eration of the Oconee Nuclear Station Unit Nos.1, 2 and 3, lccated in Oconee County, South Carolina.
The amendaents are effecti 'e as of the date of issuance.
These amendments revise the Technical Specifications to establish operating limits for Unit 1 cycle 4 operation and tighten leakage
_ limits through the_ Steam Generator tubes.
The application for the amendments complies withthe standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the C'onnission's rules and regulaticns.
The Commission has made i
appropriate findings as required by the Act and the Commission's rules
~
and. regulations in 10 CFR Chapter I, which are set forth in the license amendments. _ Prior public notice of these amend?.ents was not required
)
'since the amendments do not involve a significant hazards consideration.-
f i
The Comission has deterniined that the issuance of these amendments will ~ n~ot result in any significant environmental-impact' and that pursuant.
to 10' CFR 151.5(d)(4) an environmental impact statement or negative
' declaration -and environmental impact appraisal need not be prepared in
. ccnnection with.the' issuance of these amendments. '
}f 0
9 9 t t '2 9 k
d v'
l 2-For further details with respect to this action, see (1) the application for amendments dated March 30, 1977, as supplemented June 21, August 23,. September 8,14 and 24,1977, (2) Amendment Nos.47,
47 and 44 to License Nos. DPR-38, DPR-47, and DPR-55, respectively, and (3) the Comission's.related Safety Evaluation.
All of these. items are available for public inspection at the Comission's Public Document Room,1717 H Street, NW., Washington, D.C. anu at the Oconee County Library, 201 South Spring -Street, Walhalla, South Carolina 29691.
A copy of' items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Comission, Washington, D.C.
20555, Attention:
' Director, Division of Operating Reactors.
Dated at Bethesda, Maryland, this 4th day of October 1977.
j FOR THE NUCLEAR REGULATORY COMMISSION
.hgpfiddL A. Schwencer, Chief, Operating Reactors Branch #1 Division of Operating Reactors S
0 d
s e
~
J l
A
.. ~
'e
,#_#.e.
2.~,
.,_,,,,,g j., _
-