r
.m
/[~%,
tmrrEn sixrEs
/d ATOMIC ENERdiY COMMISGION li
- l nivisioti or cor muerece hY f
ncoion n - suire oia 9
Nr,; s e m re Acnynte srnte r, nearnuest d
'45 AT t.A Nr A GE CRGI A 30303
(
January 18, 1971 J. P. O'Peilly, Chief, Peactor Testing and Operations Branch Division of Cc~.plitnce, Feadouarters DUKE MUFR CO"PAliY (OC0JEE 1), LICFi!SE ::0 Cl FR-33, DOCD:T !;o. 50-269 The attached report of an ir.spection of the subject facility by our inspectors on Dece bar 1 h, 1970, is forwarled for inforention.
Two itres of ncnennforrr.nce with the IMAR 2re detected ducing the inapcetion.
Cne 4
iten involves chun!;es in the location of d :'t i c.n batt eries ; the other it u involves inar' equate procedures for elenninr; i he cemetor coolnnt piping.
'No iters of noncon fo1 wee with Aprenuix B to 10 CFR 50 were alco deteoud, One itea invol'ics 'he u : arent imdequate review of test reaults relating to the chee?out of nuelcar instre :ntation; tiie other iten invol'.es inec.-
plete hta pncks;es for aescral electrical c: "renents.
A CD:1 draft covering these several r:onecnformance itens has been suiritted to Conpliance Head-quarters f conce.
It was previously reported in CO Peport 'io. 50-269/70--11 that stainless i
teel safe enda in the prir.ary coolant pump discharge nozzles had become censitized as a result of heat treating adjacent carbon steel welds.
Our inspector was informed during this inspection that the licensee now plans to overlay the interior of at least two of the nozzles and, if time permits in the construction schedule, the renaining two safo ends will also be backclad. We will continue to carry 1.his is en outstanding item pending ccmpletion of the tacke.ladding effort.
The licenne 2's reactor core 1cading schedule hac slipped from April to I.*ay 1971. We feel that September 1971 would be a rure realistic date for loading fuel.
)
byD-[
e W. C. Seidle C0:II:KCS Cenior Peactor Inspector
Enclosure:
CO Ept. I:o. 50-269/'(0-12 (1<urphy )
s 1
7011280 ' D-9
f 3
J. P. O'Itell]y Junu'iry 18,19'll ce v/ encl:
E. G. Case, DR3 (3)
P. A. L'orri s, DRL P. 3. Foyci, ImL (2)
R. C. DeYoung, DHL (2)
D. J. Skovholt, DHL (3)
P. '4 Howe, DHL (2)
A. Gi mboono, CO L. Kornblith, Jr., C0 H. li. Fngelken, C0 F. W.
Kirkenn, CO:I B. H. Grier, C0:1Il J. W. Flora, CO:lV R. W. :'mi t.h, CO :V FG Uijen 3