ML19317D257
| ML19317D257 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/18/1978 |
| From: | Parker W DUKE POWER CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19317D258 | List: |
| References | |
| NUDOCS 7911190636 | |
| Download: ML19317D257 (4) | |
Text
k.. 4
~
REGULATORY INFORMATION DISTRIDUTION SYSTEM (RID DIGTRIDUTION FOR INCOMING MATERIAL
-2M 270/287 REC: DENTON H R ORO: PARKER W O DOCDATE: 09/18/78 NRC DUKE PWR DATE RCVD: 09/22/78 DOCTYFE: LETTER NOTARIZED: YES COPIES RECEIVED LTR 3 ENCL 40 SUDJECT:
FORWARDING LIC NOS DPR-07, 47
.% 55 APPL FOR AMEND: TECH SPEC PROPOSED CHANGE CONCERNING REVISION TO THE CORE PROTECTION SAFETY LIMITS AND PROTECTIVE SYSTEM MAXIMUM ALLOWAELE GETPOINTS, IN SUPPORT OF OPERATION FOR FULL RATED PWR DURING CYCLE 4.
W/ATT R _, y,.
,'+1f, Cc_.% 2-:2 h. / 1, c.q c /c ;/
-i~c
- 9 O PLANT NAME: OCONEE - UNIT 1 REVIEWER INITIAL:
XJM OCONEE - UNIT 2 DISTRIBUTER INITI AL:hJ'Cd OCONEE - UNIT 3
- x******* DICTRIBUTION OF THIS MATERIAL IS AS FOLLOWS **********+++++***
NOTES:
1.
M.
CUNNINGHAM -- ALL AMENDMENTS TO FSAR AND CHANGES TO TECH SPECS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.
(DISTRIEUTION CODE A001.1 FOR ACTION:
BR CHIEF ORB #4 CC**W/7 ENCL INTERNAL:
- W/ENCLh).
NRC PDR**W/ ENCL
- E ER*+W/ ENCL u
AD FOR SYS & PROJ**W/ ENCL ENGINEERING BR**W/ ENCL REACTOR SAFETY BR**W/ ENCL PLANT SYSTEMS BR**W/ ENCL EED**W/ ENCL EFFLUENT TREAT SYS**W/ ENCL 4714 CNi J MCGOUGH**W/ ENCL CdELJ t.u/ 2. E w ! y "I.% b EX TERN AL;'
LPDR'S WALHALLA, SC nW/ ENCL TERA **W/ ENCL NSIC nW/ ENCL ACRS CAT B**W/16 ENCL l
$$$$$$$t$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
CHECK NCR: 235,540 l
L AMOUNT:
$4,000.00
-\\
CHECK AND COPY OF TRANSMITTAL LTR ADVANCED TO W.
MILLER (LFMB) (09/25/73) UPON RECIEPT l
$$$$$$$$$$7$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$!G$$$
/
DISTRIEUTION-LTR 40 ENCL 39 CONTROL NBR:
790860165 9IZE: 3P+26P+31P t**44M *+444444444****n>441++1****
THE END
- +**.t4+* n******** g 4*****
'l9111906 3 6 g
~~
.R, n,9 DT xz PowEn Co>mai'r ::.ea-
/ "7 El Powzm Ben.mxo
(
422 Socis Caracu Srazzi Cnar.o::z N. C. asa42 wau4-
=
- c a. s a.
September 13, 1973
- CLC*-C=C aaCA '04 ACE 8*tS.3Cgt 373 4C S3
$ tta. a,ogyg.icn Mr. Harold R. Deuten, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commdssion Washing:en, D. C.
20535 A::ention:
Mr. 1. Reid, Chief Opera:ing Reactors 3:anch 14
Reference:
Oconee Nuclear Station Decke: No. 50-269, -270,-237
Dear Sir:
Pursuan: Oc 10CFR 50, 150.90, please find at: ached proposed changes to the Ccenee Nuclear Sta:ica Technical Specifica ices.
These changes are required to support the operation of Oconee Uni: 2 at full ra:ed pcVer during Cycle 4 This proposal consis: of the foll wing changes.
The Core ?:ctec:ic: Safety Limits and Protec:ive System Maximus Allowable Se:pcin:s contained in Speci-fica icns 2.1 and 2.3 respec:ively, have been revised.
The bases of Specifi-redue:icaofy)Iposedremovaloforifice:d carica 2.1 has been revised to reflect the p-a g :o 1.71.
Specifica:ica 3.2 assenblies and :he subsequen:
has been revised :o reflec: the boron volune require =ents upon s:artup of Uni: 2 for Cycle 4 The bases and Table 3.5-1 of Specifica: ice 3.5 have been revised to reflec: the new s:eady sca:e :11: Id * : of 5".
The pr:pcsed Tech-' cal Specifications changes also include a change in :he xenen reac:ivity specifica:icn (Specifica:icn 3.5.2.5) applicable :o all three Ccenee cui:s.
This change in the xenen reac:1vi:7 specifica:ica is based on :he considera: ice of :he effect of :he ::ansian: xenon en pcwer peaking calcula:ed for Oconee 1 Cycle 5, Occeee 2 Cycle 4, and Oconee 3 Cycle 4 and based on eccfir=atice tha:
- he proposed liniting condi:1ca for xence reac-ivi:7 conservatively ensures acceptable pcver peaks during xenon ::ansien:s.
The applicable da:t for Oconee 1 Cycle 5 were provided :o :he NRC in ny let:a of Augus: 23, 1978.
The da:2 for Occeee 2 and 3 are sd d'a: and consis:en: wi:h the Oconee 1 da:a.
Also a:: ached is 3abcock and Wilcox Repor: 3AW-1491, "Cconee Uni: 2, Cycle 4 Rel:ad Report."
This report includes a su=sary of Cycle 4 operating part=e:ers and ::ntains the safe:7 analyses suppor:ing the operatice of Cecnee 2, Cycle 4 core at raced power in accordance with the Technical Specifications p cvided.
b j
7% E1H
~
.' Mr. Harold R. D1nton, Director Ptga Two September 13, 1978 On June 3, 1973, Duke Power Company filed a request for exenpcion from 10CFR30, 150.46 for Oconee Unit 3 based on a staff request.
It continues to be our posi: ion tha: the Oconee ECCS is curren:17 acceptable and wholly in coafor:-
ance with LOCF330, 150.46.
Inprovements to the ICCS prior to the startup of Uni: 2 following the forthcoming refueling are neither necessary nor feasible.
Ecweve'., in response to a staff requirement and pursuant to ICCF330, 150.12, i: is hereby requested that an exemption be granted :o the provision of ICCFR 50, 150.46 and that Oconee Uni: 2 be licensed to operate at full rated core thernal power (2568 MW:).
This proposed revision to the Oconee Nuclear Sta: ion Technical Specifications is :ensidered to involve a single saf ety issue wi:h no significant hazards involved and two duplicate acendments for the identical Oconee units.
Accord-ingly, a check in the a=ount of Si,300 is attached, consisting of :he licensing f ees for one Class III amend:ent and two Class I anend=ents.
Three signed originals and thirry-seven copies are provided in this submittal.
7 ry truly yours7
~
-/
Gw a ld.
"Jillias 0. Parker, J.
RIG:ses A::ach=ents (40)
,--9 r
Mr. 'darold R. Dcuton, Diractor Page Thrsa September 18, 1978
'4ILLLui 0. PAR.ER, JR., being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign er.d file wi:h the Nuclear Regulatory Com=ission this request; and that all statements and satters set forth therein are true and corra.c: to the best of his 'c2cwledge.
/
/,
A s v s.
Lo -
wR -
"Jilliam O. Parker, Jr., Ec'e President Subscribed and sworn to before ce this 13th day of Septa =ber,1978.
filH&i t ~
k Akl,es Notary Public My Co dssion F.xpiras:
Feb ruar-r 15. 1982
... --