ML19317D226

From kanterella
Jump to navigation Jump to search
Requests Changes to Tech Spec 3.5,incorporating Control Rod Position & Axial Imbalance Limits to Period After 100 Plus or Minus 10 Effective Full Power Days.Forwards Proposed Tech Spec,Justification for Change & BAW-1477.B&W Rept Not Encl
Date released: 11/27/2019 Download: ML19317D226


Proposed Tech Spec 3.5 Incorporating Control Rod Position & Axial Imbalance Limits to Period After 100 Plus or Minus 10 Effective Full Power Days
ML19317D227
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/23/1978
From:
DUKE POWER CO.
To:
References
Download: ML19317D227 (14)
Requests Changes to Tech Spec 3.5,incorporating Control Rod Position & Axial Imbalance Limits to Period After 100 Plus or Minus 10 Effective Full Power Days.Forwards Proposed Tech Spec,Justification for Change & BAW-1477.B&W Rept Not Encl
ML19317D225
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/23/1978
From: Parker W
DUKE POWER CO.
To: CASE E G
Office of Nuclear Reactor Regulation
References
Download: ML19317D225 (11)