ML19317D217

From kanterella
Jump to navigation Jump to search
Requests Change to Tech Spec 3.1,supplementing 770621 & 771216 Submittals Re Steam Generator Leak Limit During Shutdown.Proposed Tech Spec,Results of Tube re-examination & Results of Eddy Current Examination Encl
Date released: 11/27/2019 Download: ML19317D217


Proposed Tech Spec 3.1 Allowing Max 1 Gallon Per Minute Leakage Through Steam Generator Tubes Prior to Initiation of Unit Shutdown
ML19317D222
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 06/08/1978
From:
DUKE POWER CO.
To:
References
Download: ML19317D222 (2)
Requests Change to Tech Spec 3.1,supplementing 770621 & 771216 Submittals Re Steam Generator Leak Limit During Shutdown.Proposed Tech Spec,Results of Tube re-examination & Results of Eddy Current Examination Encl
ML19317D216
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 06/08/1978
From: Parker W
DUKE POWER CO.
To: CASE E G, REID R W
Office of Nuclear Reactor Regulation
References
Download: ML19317D216 (6)