ML19316A796
| ML19316A796 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/17/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burnstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML19316A797 | List: |
| References | |
| NUDOCS 8005270547 | |
| Download: ML19316A796 (2) | |
See also: IR 05000266/1980005
Text
.
- . . .
.
,
o rs nq,'o
'
o
y[c -
g
g
UNITED STATES
g
NUCLEAR REGULATORY COMMISSION
g
e
REGION ill
0[
C.
799 ROOSEVELT ROAD
%* a . . . ,o
GLEN ELLYN, ILLINOIS 80137
APR l'i b80
,
.
DocketNo.h0-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 53201
Gentlemen:
This refers to the inspection conducted by Mr. K. D. Ward of the office
on March 6 and 20, 1980, of activities at the Point Beach ~ Nuclear Plant,
Units 1 and 2, authorized by NRC Operating License No. DPR-24 and No.
DPR-27 and to the discussions of our findings with Mr. G. Reed and others
of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and representative records, obser-
vations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of ,thfs inspection.
In accordanci'with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
j
or your contractors believe to be proprietary, you must apply in writing
j
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that proprietary informa-
tion identified in the application is contained in an enclosure to the
application.
.
5.Yf
8006270
-
-
,
.
'
Wisconsin Electric Power
-2-
Company
ME 1 ~8
kNM
We will gladly discuss any questions you have concerning this
.
(
inspection.
Sincerely,
ufAY~
.
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-266/80-05
and No. 50-301/80-04
cc w/ encl:
Mr. G. A. Reed, Plant
Manager
,
Central Files
Reproduction Unit NRC 20b
Local PDR
Sandra A. Bast, Lakeshore
Citizens for Safe Energy
Mr. John J. Duffy. _kief
Boiler Inspecto, L partment
of Industry, La
and
Human Relations
.-
,.
. - .
, - -
-
, , . .