ML19316A682

From kanterella
Jump to navigation Jump to search
Forwards Comments on Tech Specs.Requests Discussion W/Util
ML19316A682
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/13/1972
From: Chatterton M, Dunenfeld M
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001130232
Download: ML19316A682 (3)


Text

_

m

?

kl

' Fr

[

(f UNITED ST ATES

[ \\g ; ~ *,

ATOMIC ENERGY COMMISSION b

WASHING 1 ON. D C.

20545

%,'- \\ *,)

0GT 131972 i

.[

Memo to the File t

DUKE POWER COMPAtiY, OCONEE NUCLEAR STATION U111TS 2 & 3, DOCKET NOS.

50-270/287; TECIU;ICAL SPECIFICATION C09 ENTS h

e Attached are couraents prepared by the L: RS, Electrical, Instrumentation and control Systens Branch on the Oconec 2 and 3. Technical Specifications

+

ubich we vould like to discuss in a meeting with the applicant.

U/N11 l

l.

.ESB-166 Margaret S. Cbattertbn Electrical, Instrumentation and Control Systems Brcnch Directorate of Licensing 1

$lOLS:'

M'arvin S. Dunonfeld Electrical, Instrumentation and Control Systens Branch Directorate of Licensing

Enclosure:

Tech Spec Corrients cc w/cncl:

1. Peltier, L:PUR 4 A. Schucacer, L:PWR 4 V. Moore, L:EILCS M. Dunenfeld, L:EI&CS M. Chatterton, L:EI&CS D. Ymuth, L:2S' I

4 t

1.

8001130 p 4,

t f

TECHNICAL SPECIFICATION C01 CENTS ON OCONEE 2 & 3 p

Tech Spec No.

and Par.c Number 3.5.2.5 A specification stating that the safety groups are 3.5-8 t-withdrawn before the reactor is critical or approaching I

1 criticality is needed.

[

A specification stating power regulating control rod bank insertion limits as a function of pouer level for h

i

'd 1

full and planned partial loop modes of operation is needed.

This is somewhat stated in 3.5.2.5 and in the bases, but more detail is needed.

3.5.2.2 Under a - should the #4.7.2.1 be 4.7.2.3?

3.5-7 r) 2.1 F _.

= 1.50 is not OK.

(

2.1 Z:

l 3.5.2.4 State the steady state hot channel factors for power 3.5-7 j

operation.

3.5.2.4 A specification stating how the quadrant tilt is monitored 3.5-8 is needed.

13.5.2.4 The quadrant tilt limits of 107. and 207,that appear in 3.5-8

a. and b are too large..The trip as well as the power must be reduced.

'Specify what action is taken if one excore detector is out.

k'

Cor:nents Oconce 2 & 3 2

4 Tcch Spec'No.

and

  • Pane !! umber 3.5.2.4 A specification stating that a power cap will be taken
3. 5 -8 (Cont'd) cvery cycle with the incores.

3.1.7 lioderator coefficient - shouldn't it bc 5 x 10 f

~

3.1-17 3.5.

Bases iTny uns the paragraph on high flux trip setpoints during l

3.5-9 physics tests deleted?

j EmD i