Forwards Comments on Tech Specs 3.5.2 & 2.1 Resulting from Review of Revision 24 to FSAR
ML19316A671
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/11/1972
From: Chatterton M, Dunenfeld M
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19316A672 List:
References
NUDOCS 8001130221
Download: ML19316A671 (2)


Text

-

r

)

l.

s

-4 December 11, 1972 Files DUKE PO'JER COMPNTY, OCONEE UUCLEAR STATION U?i1TS 2 & 3, DOCKET HOS 50-270/

287; TECLCiICAL SPECIFICATIOli Com!DiTS TSAR Revision No. 24 has been reviewed for changes in the Technical Specifi-cations with regards to the cot:=cnts expressed at the occting held with Duke Power Cor.pany and Babcock & Wilcox on October 17, 1972.

(The same coments are given in a Memo to File, dated October 13, 1972).

Except for two cotements which are cicared up as a result of Revision No. 24 and two co:rx nts which were cleared up at the meeting, the previous list of items still stands.

That list of coc= cats is attached.

Margaret S. Chatterton Electrical, Instrumentation &

Control Systems Branch Directorate of Licensing Marvin S. Dunenfeld Electrical, Instruzentation &

Control Syster.s Branch Directorate of Licensing cc:

1. Peltier, L:PWR 4 j

A. Schwencer, L:FWR 4 j

D. F. Knuth, L V. Moore, L:EICSB M. Dunenfeld, L:EICSE M. Chatterton, L:EICSB L:E,6CSO thL:EI6CS orygg,.L..:EI.6C.S -

ITERTON D IENFELD MOORE.

-'x rl:7387 12/11 12/l2.-/72 12/ 4 /72-c15 ; y _ _.

j forum AEC-Sit (Rev.9 53) AECM 0240

'

  • u s covt=Nw t emutes omes.. t e72 -aea 015 8001180 M /

c i

TEC11NICAL SPECIFICATION COltENTS 0:1 OCONEE 2 & 3 Tech. Spec. No.

and Page Number 3.5.2.5 A specification stating power regulating control rod bank insertion limits as a function of power icvel for full and planned partial loop modes of operation is needed.

This is somewhat stated in 3.5.2.5 and in the bases, but more detail is needed.

N 2.1 F

= 1.50 is not OK.

2.1-2 Z

3.5.2.4 State the steady state hot channel factors for 3.5-7' power operation.

3.5.2.4 A specification stating hou the quadrant tilt is 3.5-7 monitored is needed.

3.5.2.4 The quadrant tilt limits of 107. and 207. that appear 3.5-8 in a. and b. are too large.

The trip as well as the power must be reduced.

Specify what action is taken if one excore detector is out.

3.5.2.4 A specification stating that a power map will be 3.5-8 taken every cycle uith the incores.