ML19316A642
| ML19316A642 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/11/1973 |
| From: | Stello V US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001130178 | |
| Download: ML19316A642 (1) | |
Text
i f
I l.
MAY I I 1973 I
I i
I i
R. C. DeYoung, Assistant Director for Pressurized Water Reactors, L j
DUKE POWER C0:1PANY, OCO?iEE fiUCLEAR STA::IO!1; C0;i RI.
OPERATING
{
LICEriSE REVIEW FOR UtilTS 2 A'lD 3; DOCKET fiOS. 50-270 D 50-287 i
Plant flame: Oconee fiuclear Station Units 2 and 3 Docket liumbers: 50-270 and 50-287 Licensi.:9 Stage: Operating License Responsible Branch and Project Manager: PWR 4 I. Peltier Technical Review Branch Involved:
Electrical, Instrumentation and Control Systems Granch Requested Completion Date: !!ay 14,1973 Applicant's Response Date: I!A Description of Response: Approval of Technical Specifications Review Status: Complete.
The L:RS, Electrical, Instrumentation and Control Systems Branch has completed its review of the technical ";pecifications for operation of Units 1 and 2 and Units 1, 2 and 3 including Revision 28 dated May 1,1973.
We conclude that our previous cocraents pertaining to the electrical, instrumentation and control systems have been resolved and that the technical specifications are acceptable.
t j
We consider that all aspects of the operating license review within the area of responsibility of the EI&CS Branch have been completed.
ESB-90 Victor Stello, Jr., Assistant Director l
for Reactor Safety Directorate of Licensing cc:
S. Hanauer DRTA J. Hendrie L:TR A.
iambusso, L:RP W. 'cDonald, L:0PS Oh(@Nb A. Schwencer, L:PWR 4 1
O' D 1h gf h
I. Peltier, L:PWR 4 T. Ippolito, L:EI&CS F. Rosa, L:EI&CS R. Pollard, L:EI&CS
..l:El p L:EI&C{_......L: E.]Cg..
.L :
. -~.
...../d,f ?.'.'
omu>
_[
POLLAIO:rl:
ROSAd.[,
IP S
.gg,,,
g.g.m..-.gg.,. g.,,,..
~
.--------..---l------.----------_..__
out>
n 3-mEDVI 13 0 j 7 7 r.,,. m-m mn, m m 4 ono
-b
.c.....e
-"we no p
.