ML19316A617

From kanterella
Jump to navigation Jump to search
AO-270/75-17:on 750824,component Cooling Sys Activity Increased.Caused by Letdown Cooler a Leak.Letdown Cooler a Removed from Svc & Repairs in Progress.Redundant Cooler Placed in Svc
ML19316A617
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/08/1975
From:
DUKE POWER CO.
To:
Shared Package
ML19316A615 List:
References
NUDOCS 8001130128
Download: ML19316A617 (2)


Text

--

f i

r i

DUKE POWER COMPANY j

OCONEE UNIT 2 I

Report No.: A0-270/75-17 Report Date:_ September 8, 1975 i

l Occurrence Datet August 24, 1975 1

Oconec Unit 2, Seneca, South Carolina J

Facility:

1 Increase in Component Cooling Systec activity Identification of Occurrence:

I Conditions Prior to Occurrence:_ Unit in startup 4

Description of Occurrence:

the radiation monitor trend recorder for Oconee Unit 2 On August 24, 1975, was reviewed to determine trends which might have occurred within the past l

l indicated on process 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The Component Cooling System count rate, i

23, 1975 monitor 2RIA-50, had increased from 65,000 cpm at 0800, August to 300,000 cpm at 0900, August 24, 1975. A clearly defined step was indicated at about 0930, August 23, 1975, about 20 minutes after a reactor full power. A sample of component cooling water was trip from 99 percent immediately taken and indicated that Fluorine-18 half-life 109.8 minutes in addition to the normal background activity.

was present 24, 1975, The "A" letdown cooler was removed from service at 1045, August In order to confirm 1

and by 1400 2RIA-50 count rate had decreased slightly.

)

the source of leakage, the "A" letdown cooler was placed back in service The count rate immediately increased and the l

for a short period of time.

"A" cooler was again taken out of service.

l Designation of Apparent Cause of Occurrence:

l The apparent cause of the increased activity in'the Unit 2 Component Cooling i

System is a leak in the "A" letdown cooler.

Analysis of Occurrence:

The letdown coolers are located in the Reactor Building and provide. cooling This incident resulted in an for reactor coolant prior to purification.

approximately 0.2 gal./ min. leak from the Letdown System to the Component t

l All radioactivity was contained since the Component Cooling l

Cooling System.

Both the Letdown System and Component Cooling System is a closed system.

When the leakage System remained capable of performing their design function.

was discovered, the cooler was isolated and the redundant cooler placed_in j

It is concluded that the health and safety of the public was not service.

affected by this incident.

8001130/ g

J g_

c l

Corrective Action:

The "A" Ictdown cooler has been taken out of service and isolated and the redundant cooler placed in service.

Repairs to the "A" letdown cooler are in progress.

i G

O I

1