ML19316A574
| ML19316A574 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 07/10/1973 |
| From: | Schwencer A US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Shao L US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001130076 | |
| Download: ML19316A574 (1) | |
Text
__
t '
i.
I.
N e
s
./
t.
~,
(jp
- 7 JUL 1 o tg73 Docket Nos. 50-270' and 50-287 L. C. Shao, Chief, Structural Engineering Branch, L OVERPRESSURE IN THE STEAM GENERATOR SUBCGIPARTMDir As a result of Containment Systems' review of the Oconee 2 & 3 reactor building subcompartments, it was discovered, by using cur-rent assumptions and analysis techniques, that the LOCA produced overpressure in the steam generator subcompartment, naybe about 4 psi higher than the original design overpressure. The applicant (Duke Power Co=pany) has reassessed the structural capability of the subcoupartment and concluded that it is adequate to withstand the higher value. The applicant's letter report is enclosed.
(See last paragraph of page 1.)
lie would appreciate your assessment of the structural capability of the subcompartment at an early date, preferably before the ACRS Subcommittee meeting on Oconee 2 & 3 to be held July 23 and 24, 1973.
A. Schwencer, Chief Pressurized 17ater P4 actors Branch No. 4 Directorate of Licensing
Enclosure:
As stated cc:
R. C. DeYoung R. Tedesco J. Kudrick R. Maccary mm o
m Distribution:
O O
O Docket (2) ooj o tf j d o
PWR-4 Reading I. Peltier A. Schwencer omet >
RH5.4
..... P Y,L IPelt
- cls AS neer g-sungaur >
7/ /71
....q.. /73-7 j
part >
' ~ ' ' ~
Forva AEC-338 lRev.9 53) A 0240
. s, covraxuorr paorT:NG OFFICE : WO O. 435-346 8 0 01130 07f C