ML19316A568
| ML19316A568 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/30/1977 |
| From: | Parker W DUKE POWER CO. |
| To: | Case G Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8001100784 | |
| Download: ML19316A568 (3) | |
Text
h76)
FI WE NRC DISTRIBUTION FcR ART 50 DOCKET MATERI AL DATE bF DOCUMER$t FROM: DUKE POWER CO.
o 6 O/77
- U*
A CHARLOITE, N.C.
W.O. PARRER, JR.
DAT VED
$ETTER ONdTORIZED PROP INPUT FORM NUMBER OF COPtES RECElvEO ConciN AL uncLASSIFIE D ff %QP. b- (r 77 tik.
T/Ji $
t cucuosu"e EscasPTaon
- [
ERRATA TO BAW-1437, JUNE 1977 REPORT "ANALYSMS OF CAPSULE OCllC FROM DUKE POWER CO OG,0 NEE U::IT
.(
g 2 REACTOR VESSEL MATERIAL SURVEILLANCE PROGRdi".
r
/
6 (IP & IP)
DO NDHMDE
~
AC7diOWLEDGED.
PLANT NAME:
OCONEE # 2, aab FOR ACTION /iNFORMATION ENVIRfRilENTAL cAFEqv ASSIGb1D_AD_t ASSIGNED AD:
V. M') ORE (LTR)
/
upa.NCH CHIEEt
( Ch ujc ncap- [S?
BRANCH CHIEF:
E PROJECT E !AGER:
3kboFi PROJECT MANAGER:
[
LICENSING ASSISTANT:
A %d LICENSING ASSISTANT:
B. HARLESS
'i INTERNAL DISTRIBUTION rc 7TLEd j SYETJMS SAFETY l
PLANT SYSTEMS l
SITE SAFETY &
Ml M 1/
5P M P.
HEINNAN TEDESCO L ENVIRON ANALYSIS
~
I/kT 4 E l%/
SCHROEDER BENAROYA DENTON & MULLER I
TAINAS CFFTCHFTFTD f
netn
<GOSSICK & STAFF ENGINEERING IPPOLITO
~
I/!uaNmro 1(NTCHT F. ROSA ES"IIRO TECH.
l iuToc POSNAK ERNST V
SIEVELL l OPERATING REACTORS 3ALLARD aj ra r:F i unyn PAWLICKI l
STELLO VOUNGELOOD N
ETSENHUT D903FCT MANACFF7NT REACTOR SAFETY SHAO
' cifnvunLT ROSS b
BAER I P. Cet LTNS NOVAK
/
BUTLER GAMMILL (2)
MOUS ION
. ROSZTOCZY
[
GRIMES
)IvetT2
/
CHECK SITE ANALYSIS VOLLMER MELTvvrS SK AT&I
, BUNCH l
SALTZMAN
/
J. COLLINS KREGER l
- _RUTBERG
[
y j
,EJTERNAL DISTRIBUTION CONTR OL NUMBER
)
/T LPDRs (d/d/hd//L 3G l
{,5 y
[ TIC
~
/ NSIC P
NAT LAB _ _ _ _ _ _, _ _.__ _
REG IV (J. HANCHETT)I l 4
771870C46
[ 16 CYS ACRS SENT CAI! GORY f)
I I 8001100 g y
/
DUKE POWER COMPANY l'uwru llen. nmo 4'.! Socras Csicucs: Srarer. C sAutorrr. N. C. ute.m t
/~..
.,u i. a Q PA R m E R,.A R.
June 30, 1977 y gr Pet St LE**T 5 7[ame PooDsCT'OM TELE **a0*sCl Amta 704 3 73 40(p 3 Mr. Edson G. Case, Acting Director Of fice of Nuclear Reactor Pegulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 go,g, Re:
Ocoace Nuclear Station geg@
Docket No. 50-270
Dear Sir:
My letter of June 6,1977, provided report BAW-1437, June,1977 " Analysis of Capsule OC11-C from Duke Power Company Oconee Unit 2 Reactor Vessel Riterials Survefilance Program".
Several minor errors have been identified in that report.
Please find attached 40 copies of an errata for this report.
Very truly yours, i
b<ffde 0 ads s
William O. Parker, Jr.
,,a-
~
MST:ge
.3 Attachment
/
o 3
x Q
I(,
J L)
C; JUL 51977> j W,3, HucttAt nasucet
~
i l
cwmese N
2, "w
133 s.
N-771370046
j I
THE BABC0CK & WILC0X COMPANY F
POWER GENERATION. GROUP l Distribution To i
f i
from t
A. L. Lowe, Jr., PE, et al.
sos 663.s l
4 File No.
I Cust.
or Ref.
Date Su bj.
June 14, 1977 l
ERRATA - Report BAW-1437 I
ln,.i....,.........................w.....i,.
Please make the changes described below in your copy of BAW-1437, " Analysis of Caasule OCII-C From Duke Power Company Oconee Nuclear 3tation, Unit 2 - RVMS Program."
Description Page y
3-1 Paragraph 2, line 2: Change SA502 to SA508.
Last Paragraph: Change to insert underlined words in place of those now in the text; should then read as follows:
All test specimens were machined from the 1/4-thickness location of the shell forging. Charpy V-notch and tensile specimens from the vessel ma-terial were oriented with their longitudinal axes parallel to the principal working direction of the forgings; the specimens were also otiented trans-verse to the principal working direction. Capsule OCII-C contained dosim-eter wires, described as follows:
C-19 Figure C-9: On the line labeled T 'DT, enter -20F.
On the line labeled RTNDT' "" *#
Correcting these errors by hand will climinate issuing a revision. Thank you.
j t
0
,- 1