ML19316A526

From kanterella
Jump to navigation Jump to search
Forwards Proposed Tech Specs Changes Required to Support Unit Operation at Full Rated Power
Date released: 11/26/2019 Download: ML19316A526


Proposed Revisions to Tech Specs 2.3,3.2 & 3.5.2.4 to Support Cycle 4 Operation at Full Power
ML19316A527
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 05/30/1978
From:
DUKE POWER CO.
To:
References
Download: ML19316A527 (23)
Forwards Proposed Tech Specs Changes Required to Support Unit Operation at Full Rated Power
ML19316A525
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 05/30/1978
From: Parker W
DUKE POWER CO.
To: CASE E G, REID R
Office of Nuclear Reactor Regulation
References
Download: ML19316A525 (4)