ML19316A496
| ML19316A496 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/30/1975 |
| From: | Purple R Office of Nuclear Reactor Regulation |
| To: | Schroeder F Office of Nuclear Reactor Regulation |
| References | |
| ORB-1-158, NUDOCS 7912300002 | |
| Download: ML19316A496 (3) | |
Text
__________ ____________
%Ad 3
I i
f MAY 3 01975
- i I
I, i
\\,
\\,
ii of Technical Review
{
f
' F. Schroeder, Acting Director, Div s on TECmi1 CAL ASSISTANCE REQUEST NO. ORB-1-158 Your assistance is requested for the following:
l Oconee Nuclear Station, Units 1, 2 4 3 PLANT NAME:
ower Company LICENSEE:
0-269,50-270 6 50-287 l
c 3j DOCKET NOS:
ORBI RESPOMEIBLE BRANCP:
C. M. Tramme11L (ext. 7434)
CONTACT:
Core Performance Branch
}
EO!NICAL REVIEW BRANCH:
l
' Rod worth experiments at another facility during zero power testing revealed a deficiency in the l
DESC'tIPTION OF REQUEST: method used to calculate the maximum ejected rod In order to correct this e
worth for B&W plants.
error, the rod insertion limits for Rancho Seco Additional testing was planned
}
were changed.
to determine what changes in Technical Speci-i fications, if any, were required for other B6W i
With existing fuel loadings, B&W stated, plants.and Technical Revitew agreed, that no Technical i
I Specification changes should be required until the time of control rod interchange.
I Before operation following control rod inter-change, B4W plants were requested to submit i
}
fither:
i
~~'
{
results of analysis and/or experiment 1.
f which show that existing rod position limits assure that the maximum ejected I
rod worth is less than allowable limits s or
- after control rod interchange occur,
a 2..revisedrodpositionlimitsintheform
.t v.
of proposed Technical Specifications 'with l
supporting analysis which assure that the.
maximum ejected rod worth is' less than I
I allowable limits after control rod inter-ch change occurs.
I I
l l
l ;
er ricap
+
>+..
m.
ovan.wr >
+
W u. s. eovsanwsnt ram 7:ne orreces sera.ese.see
~
Q g 333 (3,,p 53) m 0240 k
),.
I
(
F. Schroeder - MAY 3 0 1975 i
For Oconee Unit 1, Duke Power Company has determined that no Technical Specification y
changs are required. See enclosed letters d
h dated April 14 and May 6,1975.
For this unit, rod interchange has taken place.
jJ For Oconee Units 2 and 3, revised rod with-drawal limits have been proposed since the hot zero power ejected rod worths after con-trol rod interchange have been predicted to exceed 1% delta k/k for certain control positions allowed by the present Technical Specification 3.5.2.5.
See enclosed letter j
and Technical Specification chenge request dated May 9,1975.
S i
Technical Review is requested to review the i
information submitted May 9,1975, for Units 2 and 3 for acceptability and provide a written evaluation to be used as nput to an SER related to the requested change.
Please note, 'in particular, that the proposal, if adopted in its present form, would permit the rod insertion limit curves to be exceeded for a period of up to two hours.
Since the proposed curves now include limitations neces-l sary to maintain ejected rod worth below allowable limits as well as limitations associated with LOCA power-peaking, the change would allow ejected rod worth limits to be exceeded for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in addition to the previously allowed deviations which are concerned only with LOCA
~
power peaking limits.
Specific comment is requested on the acceptability of this aspect of their i
proposal.
Although no changes to the Technical Specifi-cations for Unit I have been requested, an evaluation of Duke Power Company's position i
in this matter is requested to document our review.
I i
1
-e I
o 3-MAY 3 01975 F. Schroeder l '
TARGET DA111 FOR COMPLETION: July 1, 1975 (the limiting unit at Oconee is Unit 2 which is scheduled for rod interchange on July 25, 1975)
{
i triginni signed by:
Robert A. Purple Robert A. Purple, Chief Operating Reactors Branch #1 Division of Reactor Licensing
Enclosures:
1.
Duke 1tr. dtd. April 44, 1975 6
2.
Duke 1tr. dtd. Hay 6,1975 i
3.
Duke 1tr. dtd. May 9, 1975 cc w/ enclosures:
D. Ross cc w/o enclosures:
K. Go11er T. Carter C. Traz:nnell S. Sheppard S. Varga i
DISTRIBUTION Docket Files ORB #1 Reading Subj. File i
m 3
p#1// DRL M p/r$M. RM 1
5/29/75 5/10/75
.v-q ac.n. ca >sn uc=.2=
- o...u....,,.......o,,..........
--p e