ML19316A461

From kanterella
Jump to navigation Jump to search
Forwards RO-269/78-04
Date released: 11/26/2019 Download: ML19316A461


LER 78-004/01T-0:on 780301,1B Circuit Breaker Closed During Shift to High Speed.Caused by Improperly Adjusted Instantaneous Trip Setpoint.Breaker Reset & Setpoint Adjusted
ML19316A466
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/15/1978
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19316A466 (2)
RO 269/78-04:on 780301,two Reactor Bldg Cooling Units Found Inoperable Simultaneously.Caused by Insufficient Installation Procedures Allowing Trip Point to Be Set Too Low.Breaker Reset & Trip Setpoint Increased
ML19316A464
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/15/1978
From:
DUKE POWER CO.
To:
References
Download: ML19316A464 (2)
Forwards RO-269/78-04
ML19316A460
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/15/1978
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19316A460 (2)