05000269/LER-1978-010-01, /01T-0:on 780324,Unit 2 Not Verified Operable within Tech Specs Limit.Caused by Failure to Properly Issue & Follow Procedures Which Resulted in Exceeding Tech Spec Limits.Personnel Reinstructed & Procedures Rewritten

From kanterella
(Redirected from ML19316A392)
Jump to navigation Jump to search
/01T-0:on 780324,Unit 2 Not Verified Operable within Tech Specs Limit.Caused by Failure to Properly Issue & Follow Procedures Which Resulted in Exceeding Tech Spec Limits.Personnel Reinstructed & Procedures Rewritten
ML19316A392
Person / Time
Site: Oconee 
Issue date: 04/07/1978
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19316A386 List:
References
LER-78-010-01T, LER-78-10-1T, NUDOCS 7912110652
Download: ML19316A392 (1)


LER-1978-010, /01T-0:on 780324,Unit 2 Not Verified Operable within Tech Specs Limit.Caused by Failure to Properly Issue & Follow Procedures Which Resulted in Exceeding Tech Spec Limits.Personnel Reinstructed & Procedures Rewritten
Event date:
Report date:
2691978010R01 - NRC Website

text

.

I NAC PC%M 384 0m U. S. NUCLEA*4 KECULATCnY CoMMtSSION LICENSEE EVENT REPORT EXHIBIT A CoNTRoLBloCX: l l

l l l l l

(ptgASE PRINT oR TYPE ALL REQU3 RED INFoRMATioNI i

R lSl C!N IE lEl 1l @1.0 l 0 l -10 l0 l 0 l 010 l-l 010l@ 4 l 1l 1l1 l 11@[

l l

s, car w @

. uctases coos i.

ucsassau=.sa

p

=

uctusa n,e a con *T l' E I L @l 0l 5 l 0 ; 0 ; 0l2 l 6 l 9 gl0 l 3 l 2 l 4l 7 l 8 gl0 l 4 l 0l7 l 7 l 8 lg lot'l i

e

=

.i ooc. 1mu....

sviar oAri 1.

n

.., car o.1 EVENT QESCRIPT1oM ANo PAos ASLE CoNSECUENCES to io 121 i On March 23, 1978 during norma operation of the Oconee Station, Keowee ITTT1i Hydro Unit 1 was taken out-of-service.

Keowee Unit 2, the standby 3

io i. i ;

emergency power source, was not verified operable within the Tech Spec io isi i limit of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The verification was completed 5 minutes later than required.

Since other off-site power sources were available to supply

,,g,,

[ o t,1 l emergency power, if required, there were no adverse effects of public t o sei I health and safety as a result of this incident.

l CCCE CCOE su C E W PC=tMTC006 c's su g

ioi2i l El El@ g@ l A l@ l Z l ZlZ l Z l Zl Zl @ sg. g gg i.

i, m

cise""c5 a ',5" 6,,"u,,.o

- ni = r v.,.

o'g' 17 18 I l--I I.OII =i)I l-1 101 11 lT I y

r l

u n

n 1.

a.

2, u

n ti2 N W lJ JJST 504ET;"

T@l Zl@

l Z!g l0lO!0@l a?.S;;;',t R',. ";".,'(fy

..ctl?;&~r, cu..

s Of l N lg l Z j@

lZ l9l9 "l causE CEsCateriCN ANO CCAAEC'nVE ACTICNS h gl The cause of the incident was failure to properly issue and follow gi established procedures which resulted in exceeding Tech Spec limits.

mi The corrective action taken was review and reinstruction of personnel

,,,,,l and a change to procedures to assure meeting Tech Spec requirements in tit.i t this area.

A

% POWER CTl*(R STATUS On

.,v Av IiI5l W @ lll0-l0l@l DISCCVERY CESQMiPTICM NA l

lAIgl Operator Observation l

'.cnviry co'Arawr AmoygfOpagny,TV @ l (ggAygggcpag(gggg@

=eusseso,ag(IAst i

]@ Ugl NA i a

[

NA

[

nase==e'6 excesOes casc=ieric= @

=uw.an rvn ltl>ll0l0l0I@[Zl@l NA l

' naso,, e'c'=u'a'ies l EuD..=0 lgloiscairrie=@

l l

NA is l

i.

i

'@' * * *".*s'c"'Mo',, " @

i A L.ZJ@t NA l

4 es t emirriCN 17101 b.s61 NA NAuE cs enErAaEn K. R. Wilson 704/373-8197 r>4cN E:

7912110 M e-

-+-s