ML19316A044
| ML19316A044 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/27/1973 |
| From: | Thies A DUKE POWER CO. |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7911210610 | |
| Download: ML19316A044 (2) | |
Text
_ _ _ _ _ - - - _ _ -.
AEC DIS *!
'BUTION FOR PART SO DOCKET MATER
- Q (TDiPORARY FORM)
CONTROL NO _ 6m FILE:
FROM:
DATE OF DOC DATE REC'D LTR MEMO RPT OTHER Duko Power Company Chcriotte, N.C. 28201 Mr. A. C. Theig 8-27-73 8-31-73 X
TO:
ORIG CC OTHER SENT AEC PDR vvy A. Giambusno 1
CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:
XXX 1
50-269 DESCRIPTION:
ENCLOSURES:
Ltr. adv.
that 95% power is scheduled for ACKHOL__u m D e c. 7-9-19-73.
DO NOT REMOVE PLANT NAME:
Oconee 1 l
l FOR ACTION /INFORMATION 9-4-73
.T B l
BUTLER (L) dCIMENCER(L)
ZIDIANN(L)
REGAN(E)
W/ Copies W/. Copies W/ Copies W/. Copies CLARK (L)
STOLZ(L)
DICKER (E)
W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)
VASSALLO(L)
KNIGHION(E)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)
SCHDIEL(L)
YOUNGBLCOD(E)
W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION h G FILE)
TECH REVIEW DENTON A/T IND raru run
/ HENDRid GRIMES LIC ASST o
BRAIIMAN OGC, ROOM P-506A SCHROEDER
, GAMMILL DIGGS (L)
SALTZMAN MUNTZING/ STAFF MACCARY KASTNER GEARIN (L)
CASE KNIGHT BALLARD wTOULBOURNE (L)
_ PLANS
/CIAMBUSSO PAWLICKI SPANGLER LEE (L)
V MCDONALD BOYD SHA0 MAIGRET (L)
DUBE MOORE (L)(BRR)
STELLO j ENVIRO SERVICE (L)
/DEYOUNG(L)(PWR)
HOUSTON MULLER SHEPPARD (E)
INFO SKOVHOLT (L)
NOVAK l DICKER SMITH (L)
C. MILES P. COLLINS ROSS KNIGHTON TEETS (L)
IPPOLITO YOUNGBLOOD WADE (E)
/ REG OPR TEDESCO REGAN WILLIAMS (E)
FILE & REGION (3)
LONG PROJECT LDR WILSON (L)
I#
MORRIS LAINAS 7911210 6/ 6 STEELE BENAROYA HARLESS VOLINER
/1 - LOCAL PDR EXTERNAL DISTRIBUTION Pfl un t h s11. - er -
" '{
l - DTIE(AEERNATHY)
(1)(2)(10)-NATIONAL LAB'S 1-PDR-SAN /LA/NY,'
1 - NSIC(BUCHANAN) 1-R.Schoonraker,0C.GT,D-323 1-GERALD LELLOUCl4 1 - ASLB(YCRE/SAYRE/
1-R. CATLIN, E-256-GT BROOKHAVEN NAT. LAB WOODARD/"IT' ST.
1-CONSULTANT'S 1-AGMED(WALTER K0 ESTER 16 - CYS ACRS HOLDING NEWMARK/BLUME/ACEABIAN RM-C-427-GT l-GERALD ULRIKSON...ORNL l-RD.. MULLER..F-309 GT
TT6EW F?lis C f.
DUKE POWER COMPANY Powen Uu x.orwo 42a Sourn Gnuncu STnzzT, CuAaI4TTz, N. C. asaos A. C. THIES P. o. Box 217e sansom VeCE PatseDE NT Peopucteow AND T ea ms teissioN August 27, 1973 Mr. Angelo Giambusso Deputy Director for Reactor Projects Directorate of Licensing U. S. Atomic Energy Commission Washington, D. C.
20545 Re: Oconee Nuclear Station
- --,,;, y Unit 1 Docket No. 50-269
Dear Mr. Giambusso:
Technical Specification 6.6.1.1(a) requires that a startup report be submitted to the AEC within 60 days following the commencement of commercial operation.
Since Oconee 1 had demonstrated reliable operation at the 75 percent power level, the unit was declared commercial at this power level on July 16, 1973. However, unit startup and power escalation testing are continuing and 95 percent power level testing is scheduled to be completed by September 19, 1973.
It is our understanding that the Startup Report is intended to be a summary of unit startup and power escalation testing, and an evaluation of the results thereof. As such, the Oconee 1 Startup Report should address activities through, and including, testing at the 95 percent power level. Therefore, with your concurrence, we would plan to submit this report within 60 days of the completion of the 95 percent power level testing.
Very truly yours,
'b Y
.s..
A. C. Thies p
. g C
giganut y HL set
+ w' l
k