Forwards IE Insp Repts 50-321/80-11 & 50-366/80-11 on 800202-0307 & Notice of Violation
ML19312F000
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/29/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19312E993 List:
References
NUDOCS 8006180327
Download: ML19312F000 (2)


See also: IR 05000321/1980011

Text

.,-

.

b

/

UNITED STATES

o

8'

g

NUCLEAR REGULATORY COMMISSION

p

g

g

e

REGION 11

0

101 MARIFTTA ST , N.W sulTE 3100

ATLANTA, GEORGIA 30303

'

APR 2 91980

In Reply Refer To:

RII:RFR

50-321/80-11

50-366/80-11

- . _

_- - - - - -

-

-.

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

-

This refers to the inspection conducted by R. F. Rogers of this office on

February 2 through March 7,1980 of activities authorized by NRC Licens~e Nos.

DPR-57 and NPF-5 for the Hatch facility, and to the discussion of our findings

held with M. Manry at the conclusion of the inspection.

Inspection findings

were also discussed in our office with senior representatives of your staff

on April 16, 1980 (reference Inspection Report No. 50-366/80-20).

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

1

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

I

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncompli-

ance; and (3) the date when full compliance will be achieved.

f

In addition to the need for corrective action regarding these specific items

of noncompliance, we are concerned about the implementation of your management

control systems that permitted their occurrence. Consequently, in your rep'y,

yott should describe in particular th^se acti:n t3 ken or planned to imp m c

,

the effectiveness of your management controls. Your reply will be carefully

evaluated to determine whether changes, relative to the Hatch site, should be

made in the inspection and enforcement programs.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

thespgc

gegio

eporpwillbeplaceq'_inthePuplicDocumentRoosi._ _ _ - . , - __.

--

--

i

e

.

_

_

,

_

_

.

.

AFR 2 91980

.

Georgia Power Company

-2-

3

-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

_e.o 9AL

ames P. O'Reilly

' rec to r--

..

Enclosures:

1.

Appendix A, Notice of

olation

2.

Inspection Report Nos. 5 W I/80- 1

and 50-366/80-11

e

cc w/ encl:

M. Manry, Plant Manager

P. O. Box 442

Bay. ley, GA 31513

C. E. Belflower

.

Site QA Super.isor

P. O. Box 442

Baxley, GA 31513

W. A.'Widner

,

Vice President and General Manager

Nuclear Generation

,

Georgia Power Company

Post Office Box 4545

Atlanta, GA 30303

.

A

3

4

+

ew+-..A

== ~

e,e==w.

_.edus eh* -

^

" * - * - * * " - "

  • " * " ' " " " * * ' *8""""

-~*

~~