ML19312E497

From kanterella
Jump to navigation Jump to search
Forwards LER 80-024/03L-0
Date released: 11/22/2019 Download: ML19312E497


LER 80-024/03L:on 800430,while Making Containment Insp, Discovered Cracked Weld on 11B Reactor Coolant Pump Control Bleedoff Line.Caused by Metal Fatigue Induced by Vibration. Pipe Replaced & Weld Repair Performed
ML19312E503
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 05/30/1980
From: Davis S, Huseby D
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19312E503 (1)
Forwards LER 80-024/03L-0
ML19312E496
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 05/30/1980
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19312E496 (1)