Provides Addl Funding for Lll Assistance Re TMI Lessons Learned Implementation.Std Order for DOE Work Encl for Acceptance
ML19312E398
Person / Time
Issue date: 04/02/1980
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Lagrone J
ENERGY, DEPT. OF
Shared Package
ML19312E399 List:
References
CON-FIN-A-0236, CON-FIN-A-236 20-19-01-04, 20-19-1-4, NUDOCS 8006040370
Download: ML19312E398 (1)


Text

.

. * =

APR 2 1980 Mr. J. B. LaGrone San Francisco Operations Office U.S. Department of Energy 1333 Broadway, Wells Fargo Building Oakland, California 94612

Dear Mr. LaGrone:

This letter provic.as additional funding to Lawrence Livermore Laboratory to support the Division of Operating Reactors in the area of TMI Lessons Learned Inplementation. The scope of this work and schedule for this program defined in my December 12, 1979 letter should be modified to include the additional items identified in the enclosure. The FY 1980 LLL Financial Plan should be modified to include an additional $105,000 for this work undar B&R 20-19-01-04.

Additional Previous FY 1980 FY 1980 FIN Funding Funding Description A0236

$725,000 1,S105,b00 TMI Lessons Learned Implementation The DOR technical contact for this program is T. Telford (301) 492-8102.

Monthly reports of technical progress and financial status should be forwarded to this office. A final report should be prepared upon completion of the work performed under FIN A0236.

The enclosed NRC Form 173 Standard Order for DOE work for a total of $200,000 is hereby submitted in accordance with Seetion III.B.2 of the DOE /NRC Memorandum of Understanding of February 24, 1978. Please indicate DOE acceptance by signing and returning the enclosed Form 173 to the NRC Office of the Controller.

Division of Accounting, with a copy to the Office of NRR, Attention:

P. Triplett.

Sincerely, Darrell C. Eisenhut, Acting Director S

Division of Operating Reactors

Enclosure:

DISTRIBUTION I

/\\j NRC Form 173 CentralFiles HBerkow Additional Work Scope D0R Reading PTriplett i

8806040 7O DGEisenhut DDandois, DA 4

JTTelford JLeonard, DB RBudnitz @RES JMartore

\\ (\\

d.

' o s

..... #, d

[N

./

R DOR 9 NRR

. o,,,ce >.

SURNAMEh b.k..

g....

4...

-+ --.- -

. !h..l.80 Y$b..l00

. h!.00 oare >

l80

.;.3!3$80 3

i

--a-.,.-

.n w

a e

NRC FoRu 173 U S. NUCLE AR REGULATORY CoMMIS$loN oRDE R NUMBE R

'248' 20-80-166 OATE STANDARD MDER r 3R DOE WORK March 6, 1980 ISSUED TO. (DOE Of fice)

ISSUED SY: (NRC Of f ee)

ACCOUNTING CITATION San Francisco Operations Office of Nuclear Reactor

""""'"'"5""

Office Regulation 3 n0200.200 Division of Onern-w %,ren,-c

  • &R NUMSER PERFORMING ORG ANIZATION AND LOCATION 20-19-01-04 FIN NUMSER Lawrence Livermore Laboratory A0236 -0 WORK PERIOD THIS ORDER FIN TITLE FIXED O EST; MATED E FROM:

TO:

Assisting NRR to Implement TMI Short Term Lessons Learned 10/01/79 09/30/80 OBLIGATION AVAILABILITY PROVIDED BY:

A THIS ORDER

$ 105,000 8 TOTAL Of ORDERS PL ActiO PRIOH TO THIS DATE WITH THf PERFORM 8NG ORGANIZATION UNDER THE SAME "APPROPRI ATION SYMBOL" AND THE FIRST FOUR DIGITS OF THE S

2,735,000

~B &R NUMB E R" CITE D ABOVE C. TOTAL ORDERS TO DATE (TOTAL A & Bi S

2,840,000 D. AMOUNT INCLUDED IN "C" APPLICABLE TO THE " FIN NUMBER" CITED IN THIS ORDER.

S 830,000 FIN ANCI AL FLEXIBILITY:

1

@ FUNDS WILL NOT BE REPROGRAMMED BETWEEN FINS. LINE D CONSTITUTES A LIMITATION ON OBLIGATIONS

'AU THORIZE D O FUNDS MA Y BE REPROGR AMMED NOT TO EXCEED 110% OF FIN LEVEL UP TO $50K. LINE C CONSTITUTES A LIMITATION ON OBLIGATIONS AUTHORIZED STANDARD TERMS AND CONDITIONS PROVIDED DOE ARE CONSIDERED PART OF THIS ORDER UNLESS OTHERWISE NOTED.

ATTACHME NTS Tile FOLLOWING ATTACHMENTS ARE HEREBY SECURITY:

i MADE A PART OF THIS ORDER:

O WORK ON THIS ORDER IS NOT CLASSIFIED.

@ STATEME NT OF WOR K O WORK ON THIS ORDER INVOLVES CLASSIFIED D ADDITIONAL TERMS AND CONDITIONS INFORMATION. NRC FORM 187 IS ATTACHED-O OTHER REMARKS:

These funds are to remain available for the use on the agreed upon program by the DOE contractor until expended or subsequent guidance is provided by a mutually acceptable NRC Form 173.

After signature, please send a copy of this order to M. Paulette Triplett, NRR, P-428.

ISSUING AUIHORITY ACCEPTING ORG ANIZATION SIGN A T /P.E M

. SJG N A T U R E M. Paulett Triplett,

/1 Ta TL E e

TITLE Fiscal / Training Assistant, NRR # 3/

N7.C FORM 173 (2-78)

Q

          • 8 m s37as33

ENCLOSURE 1 ADDITIONAL SCOPE OF WORK TMI LESSONS LEARNED NUREG 0578 NUREG 0660 Topic Designation Topic 2.1.2 II.D.1&2 Relief & Safety Valve Testing - Direct staff assistance in evaluating adequacy of EPRI & GE valve testing programs.

Independent analysis in some areas may be required (downstream piping, valve dynamics).

Plant specific reviews will be conducted to endure adequacy of testing program.

2.1.4 II.E.4.2 Containment Isolation - Some STLL followup required in instance where licensee provided interim measures to meet intent of 2.1.4 assistance in summarizing current status of containment isolation re: diversity, non-essential system and reset to be documented for use in assessing need for additional staff requirements.

2.1.8.b II.F.1 Accident Monitoring Instrumentation - Assistance with evaluation of plant specific designs for high range j

(ACRS) radict:an monitoring, containment pressure, water level and hydrogen detection required by 01/01/81.

In addition, contractor will assist with development of guidance to licensees for Reg. Guide 1.97 and review of plant specific implementation of this R.G.

2.1.3.b II.F.2 Inst. Inadequate Core Cooling - Review of licensee designs for measuring reactor vessel water level and other instrumentation for monitoring operators core cooling diagnostic capability.

2.1.6.b.

II.B.2 Degraded Core Shielding - Additional assistance to the staff to support case reviews of modifications to structures & equipment identified during the design review of plant shielding.