ML19312E243
| ML19312E243 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/21/1980 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19312E244 | List: |
| References | |
| NUDOCS 8006030581 | |
| Download: ML19312E243 (2) | |
See also: IR 05000424/1980006
Text
M
?
a car
'
/
'o'
UNITED STATES
8'
NUCLEAR REGULATORY COMMISSION
M '[GI
o
$
,E
REGION 11
$g
,
%
p'[
~
101 MARIETTA ST N.W SUITE 3100
o
'
ATLANTA. G EORGIA 30303
In Reply Refer To:
RII:ALC
50-424/80-06
50-425/80-06
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
4tlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by A. L. Cunningham of this office on
March 31 through April 2,
1980 of activities authorized by NRC Construction
Permit Nos. CPPR-108 and CPPR-109 for the A. W. Vogtle facility, and to the
discussion of our findings held with B. L. Maulsby at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Roorn. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
j
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
incl 2de a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely)
t
.
J
~ f
I
J. Philip Stohr, Chief
.
A Fuel Facility and Materials
'
Safety Branch
Enclosure:
See Page 2
80060305%)
..
.
_ .
.-
..
1
i
Georgia Power Company
-2-
APR 211980
.
'
Enclosure:
Inspection Report Nos. 50-424/80-06
and 50-425/80-06
cc w/ encl:
K. M. Gillespie,
Construction Project Manager
P. O. Box 282
Waynesboro, GA 30830
'
E. D. Groover
QA Site Supervisor
P. O. Box 282
Waynesboro, GA 30830
D. E. Dutton
!
Project General Manager
Georgia Power Company
i
'
Post Office Box 4545
'
Atlanta, GA 30303
i
.
D
.
)
i
o
/
.n.-
, ,
+.- n
_
_
,~~~-~7------~~--y--
-~;---- -- - - - :
-m-
. ~ ~ ~ ~: ~;: . '
- : T':',