ML19312E234

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-298/80-04 on 800311-13 & 24-27.No Noncompliance Noted
ML19312E234
Person / Time
Site: Cooper 
Issue date: 04/18/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML19312E235 List:
References
NUDOCS 8006030519
Download: ML19312E234 (2)


See also: IR 05000298/1980004

Text

_.

_

_

_ _ _

____

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

[

.

,{p" "CW,j

UNITED STATES

NUCLEAR REGULATORY COMMISSION

g

,

o

REGloN IV

3,

j

611 RY AN PLAZA oRIVE, SUITE 1000

g

ARLINGTON, TEXAS 76012

m, i

,,,.#

April 18,1980

,

In Reply Refer To:

Docket No. 50-298/80-04

Nebraska Public Power District

ATIN: Mr. J. M. P11 ant, Director

Licensing and Quality Assurance

P. O. Box 499

Columbus, Nebraska

68601

Gentlemen:

This refers to the inspection conducted by Messrs. G. L. Constable and

S. R. Dean of this office during the period March 11-13, and March 24-27,

1980, of activities authorized by NRC Operating Licensee DPR-46, and to the

discussions of the findings with Mr. L. C. Lessor.

Principal areas eynmined during the inspection included:

(1)

Quality Assurance

Program Review, (2)

General Elect.ric Type SBM Control Switches , (3) Plant Tour,

j

and (4) Refueling Activities. Within these areas, the inspection consisted of

j

selective e-4= tion of procedures and representative records, interviews with

j

personnel, and observations by the inspectors.

'

Within the scope of this inspection, no items of noncompliance or deviations

were identified.

I

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report conemina any information that you or your contractors believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

i

application must include a full statement of reasons on the basis of which it

is claimed that the information is proprietary and should be prepared so that

the proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard

within the specified period, the report win be placed in the Public Document

Room.

,

,

0006ca pl q

s

,

l

l

w

a

--- - ---

'

.

Nebraska Public Power District

2

April 18, 1980

Should you have any quencions concerning this inspection, we will be pleased

i

to discuss them with you.

Sincarely,

jd%v

G. L. Madsen, Chief

.

Reactor Operations and

Nuclear S'ipport Branch

'

Enclosura:

Inspection Reporr No. 50-298/80~-04

cc w/ enclosure

L. C. Lessor, Superintendent

Cooper Nuclear Station

P.O. Box 98

Brownv111e, Nebraska

68321

e

- - ,