Notifies That New Telephone Sys Called Health Physics Network (HPN) Has Been Installed at Site.Sys Intended for Use During Emergencies to Link All Power Plants & Nrc. Emergency Notification Sys Hotline Will Also Be Used
ML19312E077
Person / Time
Site: Point Beach  
Issue date: 04/18/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8006030177
Download: ML19312E077 (2)


Text

f

~.

p""%

TIC 4

UNITED STATES 8

k NUCLEAR REGULATORY COMMISSION L

eE REGION 111 D[

Q, 799 ROOSEVELT ROAD

,o GLEN ELLYN, ILLINOIS 60137 APR 181980 i

i s

Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:

Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:

A new telephone system has been installed at your site, called the Health Physics Network (HPN).

It is part of a system that includes all nuclea@

power plants, the NRC Cperations Center, and the NRC Regional Offices.

It is primarily intended for use during emergencies and will function as the dedicated line between your HP personnel, the Operations Center in Bethesda, Md. and the Regional Office.

In the event of a site emergency, the NRC will activate the HPN. You are still expected to use the Emergency Notification System (ENS) hotline for r

reporting emergencies or commercial lines if the ENS doesn't work. The HPN is a restricted network and may not be used by nongovernment employees at any time unless you have to report a significant event and both the ENS

(

and commercial telephone lines are out of service.

Lengthy consideration was given to the most efficient number and location of extensions for the ENS and HPN at each site.

It was determined that, at the typical site, the ENS should have extensions in the control room, shift supervisor's office, near site emergency operations facility (EOF) and alternate EOF, resident inspector's office, and the on-site technical Si ilarly, the HPN should have extensions where the HP support center.

m and environment staff would gather. This is generally in the HP office, EOF and alternate EOF, and the resident inspector's office.

Although each site has unique needs, a proliferation of extensions on the system could work to the disadvantage of the system. Requests for addi-tional extensions will be closely examined and may be installed only at the expense of another existing extension.

8006080/)}

h i

Wisconsin Electric Power Company If you have any questions on this matter, please contact Mr. Tom Essig of my staff, telephone (312) 932-2611.

Sincerely, I

James G. Kep er Director cc:

Mr. G. A. Reed, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR C. M. Trammell, ORB /NRR PDR Local PDR NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy Mr. John J. Duffy, Chief Boiler Inspector, Department of Industry, Labor and Human Relations

.